# 119 East 11th Street, Manhattan

Public Assembly · built c. 1920 · Block 556, Lot 68.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1005560068/119-east-11-street

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 556: https://umarelli.org/nyc/manhattan/556.md

## Building permits

- Alteration, filed Aug 31, 2026, estimated cost $5K, described as “Temporary platforms for the Best In Show event. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Aug 31, 2026, described as “Fashion show and accessory backstage area in Webster hall.”
- No Work, filed Nov 22, 2022, described as “TPA with 286 people and 4 fire guards from 7:00pm to 4:00am on 11/25/ to 11/26/22; 11/26 to 11/27/22; 12/02 to 12/03/22; 12/03 to 12/04/22; 12/08 to 12/09/22; 12/09 to 12/10/22; 12/10 to 12/11/22; 12/14 to 12/15/22; 12/16 to 12/17/22;…”
- No Work, filed Oct 28, 2022, described as “TPA with 286 people and 4 fire guards from 7:00pm to 4:00am on 11/3/22 to 11/4/22,11/4/22 to 11/5/22,11/5/22 to 11/6/22,11/10/22 to 11/11/22,11/11/22 to 11/12/22,11/12/22 to 11/13/22,11/17/22 to 11/18/22,11/1822 to 11/19/22, 11/19/22 to…”
- No Work, filed Oct 11, 2022, described as “TPA with 286 people and 4 fire guards from 7:00pm to 4:00am on 10/13/22 to 10/14/22,10/14/22 to 10/15/22,10/15/22 to 10/16/22,10/20/22 to 10/21/22,10/21/22 to 10/22/22,10/22/22 to 10/23/22,10/27/22 to 10/28/22,10/2822 to 10/29/22, 10/29/22…”
- No Work, filed Sep 30, 2022, described as “Temporary Place of Assembly with 286 people and 3 fire guards to be held on 10/6/22 to 10/7/22 from 7:00pm to 4:00am, 10/7/22 to 10/8/22 from 7:00pm to 4:00am and 10/8/22 to 10/9/22 from 7:00pm to 4:00am.”
- No Work, filed Sep 23, 2022, described as “Temporary Place of Assembly with 286 people and 3 fire guards to be held on 9/29/22 to 9/30/22 from 7:00pm to 4:00am, 9/30/22 to 10/1/22 from 7:00pm to 4:00am and 10/1/22 to 10/2/22 from 7:00pm to 4:00am.”
- No Work, filed Sep 13, 2022, described as “Temporary Place of Assembly with 286 people and 3 fire guards to be held on 9/22/22 to 9/23/22 from 8:00pm to 4:00am, 9/23/22 to 9/24/22 from 8:00pm to 4:00am and 9/24/22 to 9/25/22 from 8:00pm to 4:00am.”
- No Work, filed Sep 9, 2022
- Alteration, filed Jul 18, 2022, estimated cost $18K, described as “Installation of a steel lintel above a proposed 3'-3" door opening in an existing masonry wall. No change to use, egress or occupancy.”
- Alteration, filed Dec 17, 2020, estimated cost $50K, described as “Modification to existing mechanical system.”
- Alteration, filed Dec 17, 2020, estimated cost $47K, described as “Modification of existing sprinkler system.”
- Alteration, filed Dec 17, 2020, estimated cost $65K, described as “Removal and installation of plumbing fixtures.”
- No Work, filed Apr 15, 2019, described as “EV Events Center, LLC Events - 4/23/2019 thru 7/21/2019 from 8am-4am. 411 ppl on 1st floor, 5 fireguards; 990 ppl on 2nd floor, 10 fireguards; 359 people on the 3rd floor, 4 fireguards.”
- No Work, filed Feb 1, 2019
- Alteration, filed Aug 23, 2018, estimated cost $1K, described as “Installation of 60' high scaffold stair tower in elevator shaft (Cellar through roof). No change in use, egress, or occupancy.”
- Alteration, filed Aug 16, 2018, estimated cost $1K, described as “Installation of plywood enclosure 6-8' H x 12' L within 3' from the property line. No change in use, egress, or occupancy.”
- Alteration, filed Aug 16, 2018, estimated cost $1K, described as “Installation of heavy duty sidewalk shed 16' L x 8' W x 8' H. No change in use, egress, or occupancy.”
- Alteration, filed Feb 23, 2018, estimated cost $34K, described as “Installation of heavy duty sidewalk shed due to an emergency condition. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”

## Building history

- Alteration, filed Dec 11, 2017, permit issued - entire job/work, described as “Modify occupant load and egress for building.install new elevator. Use to remain the same.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $1,887,750
- 2026–27 Tax: $194,934
- Market value (city estimate): $4,195,000
- Taxable value: $1,795,140
- Assessed land: $688,500
- Assessed improvements: $1,199,250

## Zoning

C6-2A: floor area ratio 2.95 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Webster Hall and Annex (Individual Landmark). 14 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Union Square South (City Planning 2019M0123): Completed, decided Nov 4, 2020. This is an application by the Department of City Planning requesting a zoning map and zoning text amendment to expand the Special Union Square District, create a new subdistrict (Subdistrict B), and establish a special permit for new hotel…
- WEBSTER HALL & ANNEX (City Planning P2008M0266): Completed, decided Jun 17, 2008. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 604

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology