808 Broadway, Manhattan
Condominium · 65 units · built 1982 · Block 557, Lot 7501.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Sep 19, 2026, estimated cost $127K, described as “Application filed for minor non load bearing partitions, plumbing work and related finishes, as per plans. No change to egress, use, occupancy or bulk.”
- Alteration, filed Jul 15, 2026, estimated cost $159K, described as “Herewith file plans to renovate apartment 7C, general construction to include limited removal and construction of non-structural partitions, new lighting, new laundry appliance, and replacement of plumbing and finishes. No change to…”
- Alteration, filed Jan 12, 2026, estimated cost $6K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 24, 2025, estimated cost $62K, described as “Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Mar 20, 2025, described as “Installation and use of suspended scaffold for facade restoration/inspection as per plans submitted”
- Alteration, filed Sep 25, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Sep 19, 2024, estimated cost $134K, described as “Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 5, 2024, described as “Suspended scaffold use for Local Law # 11”
- Alteration, filed Aug 22, 2024, estimated cost $200K, described as “Interior renovation of existing Penthouse apartment 'PHH' on floors 6 and 7.”
- Alteration, filed Nov 28, 2023, estimated cost $3K, described as “Non-illuminated non-advertising residential retractable awning - no copy. No change of use, egress or occupancy.”
- Alteration, filed Jan 27, 2023, estimated cost $18K, described as “Herewith file plans to modify plumbing system as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Jan 27, 2023, estimated cost $113K, described as “Herewith file plans to renovate apt. 5G. General construction to include removal and construction of non-structural partitions and mechanical system as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Dec 28, 2022, estimated cost $3K, described as “Sprinkler system modification in apt #phd on the 6TH and 7TH floors. No change in use, occupancy, or egress.”
- Alteration, filed Nov 27, 2022, estimated cost $10K, described as “Plumbing work for existing Penthouse apartment 'PHH' on floors 6 and 7.”
- Alteration, filed Feb 24, 2022, estimated cost $100K, described as “Renovate apartment #phd on the 6TH and 7TH floor. No change in use, occupancy or egress.”
- Alteration, filed Feb 24, 2022, estimated cost $20K, described as “Plumbing fixtures in conjunction with apartment #phd renovation. No change in use, occupancy or egress.”
- Alteration, filed Oct 13, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Sep 23, 2020, estimated cost $24K, described as “Replacement and relocation of HVAC units”
- Alteration, filed Sep 23, 2020, estimated cost $40K, described as “Addition of bathroom plumbing fixtures for new bathroom. removal of one (1) tub on first floor, replacement of one (1) existing tub for one (1) new shower on second floor. New kitchen plumbing fixtures. addition of washing machine on…”
- Alteration, filed Jul 30, 2020, estimated cost $20K, described as “Plumbing modifications for apartment 4H as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Jun 9, 2020, estimated cost $12K, described as “Remove 1 tub, replace 1 lav., relocate 1 sink, 1 dishwasher, 1 gas range, install 1 lav., 1 stall shower, 1 washing machine”
- Alteration, filed Apr 29, 2019, estimated cost $3K, described as “Proposed installation of Pipe Scaffold (no shed) for facade repairs as per plans. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $13,624,650
- 2026–27 tax
- $1,343,200
- Market value (city estimate)
- $30,277,000
- Taxable value
- $12,751,060
- Assessed land
- $1,422,000
- Assessed improvements
- $12,202,650
- Condo units with their own tax lots
- 2
Zoning
C6-1: floor area ratio 5.99 built, 6.00 allowed by base zoning.
Recent sales
- Sep 17, 2026: $1,250,000
- Jun 22, 2026: $1,500,000
- Oct 3, 2025: $1,199,000
- Aug 21, 2025: $3,150,000
- May 16, 2025: $2,450,000
- Dec 10, 2024: $1,300,000
- Aug 13, 2024: $1,496,000
- Mar 23, 2023: $1,200,000
- Feb 21, 2023: $1,050,000
- Jun 10, 2022: $1,175,000
The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Union Square South (City Planning 2019M0123): Completed, decided Nov 4, 2020. This is an application by the Department of City Planning requesting a zoning map and zoning text amendment to expand the Special Union Square District, create a new subdistrict (Subdistrict B), and establish a special permit for new hotel…