# 39 East 10th Street, Manhattan

Co-op · 10 units · built c. 1900 · Block 562, Lot 38.

On Umarelli: https://umarelli.org/nyc/1005620038/39-east-10-street

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 562: https://umarelli.org/nyc/manhattan/562.md

## Building permits

- Alteration, filed Apr 28, 2023, estimated cost $35K, described as “Construction of new boiler room.”
- Alteration, filed Apr 28, 2023, estimated cost $36K, described as “New gas meter and distribution pipe for new boiler and domestic water heaters.”
- Alteration, filed Apr 28, 2023, estimated cost $80K, described as “Relocation and Replacement of existing boiler and burner. Conversion from Oil to Gas fuel source.”
- Alteration, filed May 24, 2022, described as “Installation of pipe scaffold as indicated on the attached drawngs. There are no change sin use, egress or occupancy.”
- Alteration, filed Aug 10, 2021, estimated cost $10K, described as “Mechanical scope (exhaust/venting) associated with gas dryers. Gas dryers and gas piping filed/approved under separate plumbing application.”
- Alteration, filed Aug 10, 2021, estimated cost $50K, described as “Replacement of existing gas service and distribution for residential building. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 20, 2020, estimated cost $325, described as “To file application for temporary supported pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 1, 2019, estimated cost $325, described as “To filed application for supported pipe scaffold as shown on plans. No change in use egress or occupancy under this application”
- Alteration, filed Sep 18, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Apr 18, 2018, estimated cost $5K, described as “Installation of a temporary scaffold as per plans in conjunction with general construction work. No change in use, egress or occupancy. Scaffold shall comply with 2014 NYC building code, chapter 33.”

## Property taxes

- Assessment: $5,013,900
- 2026–27 Tax: $149,571
- Market value (city estimate): $11,142,000
- Taxable value: $1,429,373
- Assessed land: $1,093,500
- Assessed improvements: $3,920,400

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $28,008 credit this tax year.

## Zoning

R7-2: floor area ratio 4.08 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- May 23, 2023: $2,525,000
- Apr 26, 2021: $1,975,000
- Aug 6, 2018: $1,810,000
- Jul 20, 2017: $311,250
- Aug 8, 2016: $1,850,000
- Apr 8, 2016: $2,150,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 92-10-BZ): Variance or Special Permit, Granted, filed May 20, 2010, decided Dec 14, 2010. Variance (§72-21) to allow for the construction of an elevator in an existing residential building, contrary to floor area, open space (§23-142) and court regulations (§§23-85, 23-87). R7-2 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology