# 9 5th Avenue, Manhattan

Co-op · 267 units · built 1953 · Block 566, Lot 1.

On Umarelli: https://umarelli.org/nyc/1005660001/9-5-avenue

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 566: https://umarelli.org/nyc/manhattan/566.md

## Building permits

- Alteration, filed Nov 6, 2026, described as “Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans”
- Alteration, filed Jun 23, 2026, estimated cost $49K, described as “General construction work in unit 20M including limited demolition/relocation of interior non-structural partitions, reframing of interior door openings, finish work, and window replacement. No change to use, egress, or occupancy.”
- Alteration, filed May 21, 2026, estimated cost $262K, described as “Interior renovation for apt 3L as per plans filed hefrewith. No change to use, egress or occupancy”
- Alteration, filed May 19, 2026, estimated cost $101K, described as “Propose cosmetic interior renovation of existing unit 3T at 3RD floor. No change in use, egress, or occupancy is proposed under this application.”
- Alteration, filed May 12, 2026, estimated cost $206K, described as “Combining existing apts. 3R and 3S as per tppn #3/97. Partition work, new doors, finishes, lighting, cabinetry. Pl work under subsequent application. No change to use, egress or occupancy.”
- Alteration, filed Mar 4, 2026, estimated cost $72K, described as “Combination of adjacent 5TH floor apartments 5T and 5U under tpp 3OF97. Selective removal and installation of nonload-bearing partitions. Plumbing to be filed under separate application. No change in use, egress or occupancy under this…”
- Alteration, filed Feb 6, 2026, estimated cost $55K, described as “Hereby filing for the interior renovation work at apartment 11N located on the 11TH floor. Filed in conjunction with plumbing application. No change to use occupancy or egress,”
- Alteration, filed Nov 26, 2025, estimated cost $65K, described as “Renovation to an existing one-bedroom apartment. Alteration includes kitchen, bathroom and flooring updates. No change is use or egress.”
- Alteration, filed Aug 8, 2025, estimated cost $460K, described as “The scope of work includes the renovation of a one bedroom apartment; new bathroom ; new kitchen. All new electrical and plumbing. Carpentry work, including new floors and partitions. Also finished work.”
- Alteration, filed Jul 16, 2025, estimated cost $177K, described as “Alterations to Apt. 5LW to include partition work, cabinetry, doors, millwork, bathroom and kitchen fixtures, replacement of PTHP units in LPC approved locations, finishes. PL work under subsequent application. No change to use, egress, or…”
- Alteration, filed Jul 16, 2025, estimated cost $173K, described as “Alterations to existing apt. Lw including partition work, kitchen cabinetry, doors, lighting, finishes. Plumbing work to be under subsequent application. No change to use, egress or occupancy.”
- Alteration, filed Jul 8, 2025, estimated cost $75K, described as “Installing 5 ton condenser with 3 relater air handlers and ductwork”
- Alteration, filed Jul 1, 2025, estimated cost $100K, described as “Removing, relocating and adding partitions for revised apartment layout. New paint, spackle to accommodate new finishes.”
- Alteration, filed Jun 17, 2025, estimated cost $86K, described as “Proposed interior renovation of kitchen and bathrooms in 12P unit.minor non bearing wall demolition and new partition new flooring,minor plumbing ,electrical work and mechanical work.new through -wall-ptac units. No change in use,egress or…”
- Alteration, filed May 1, 2025, estimated cost $138K, described as “Interior Renovation as per Architectural Plans”
- Alteration, filed Mar 18, 2025, estimated cost $120K, described as “Obtain DOB approval for the renovation of apartment #5O. Scope of work: general construction and plumbing. No change in use, egress, or occupancy”
- Alteration, filed Feb 6, 2025, estimated cost $49K, described as “Apt. 12U: reconfigure entry closet, new bookcase with interior lighting, enlarge and rebuild bedroom wall closet, refinish wood floors, patch at removals, paint work areas. No change to use, egress or occupancy”
- Alteration, filed Feb 5, 2025, estimated cost $147K, described as “Alteration per plans. No change in use, egress, or occupancy”
- Alteration, filed Feb 3, 2025, estimated cost $192K, described as “Renovation of unit 4G on 4TH floor as per plan. No change in use, occupancy or exit.”
- Alteration, filed Jan 28, 2025, estimated cost $200K, described as “Filing herewith for the renovation to existing unit #11P . Modifications to existing plumbing systems. There is no change to use, egress or occupancy.”
- Alteration, filed Dec 16, 2024, estimated cost $23K, described as “Minor partition work as per plan (interior). No change to use, occupancy and egress.”
- Alteration, filed Oct 29, 2024, estimated cost $98K, described as “Interior renovation at Apartment 9V with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Jun 18, 2024, estimated cost $136K, described as “Interior renovations to existing Apt. 2K, including partition work, cabinetry, doors, lighting fixtures, finishes. Plumbing work under subsequent application. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 18, 2024, estimated cost $110K, described as “Renovations to existing Apt. 16N to include partition work, new finishing, lighting, doors. PL work under subsequent application. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 12, 2024, estimated cost $92K, described as “Exterior repairs including mortar replacement , parapet wall repairs and lintel replacement as per plans filed herewith . No change to use, egress or occupancy.”

40 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1005660001/9-5-avenue.

## Property taxes

- Assessment: $54,964,800
- 2026–27 tax: $5,501,964
- Market value (city estimate): $122,144,000
- Taxable value: $51,013,520
- Assessed land: $3,838,500
- Assessed improvements: $51,126,300

## Tax breaks

- Co-op and condo abatement, with no end date, a $847,656 credit this tax year.

## Zoning

R10 (part of the lot is R7-2): floor area ratio 10.44 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 1, 2026: $1,965,000
- Jul 29, 2026: $730,000
- Jul 9, 2026: $2,495,000
- Apr 24, 2026: $2,695,000
- Apr 6, 2026: $1,175,000
- Apr 3, 2026: $1,007,000
- Mar 11, 2026: $2,225,000
- Mar 10, 2026: $2,330,000
- Feb 27, 2026: $1,190,000
- Feb 27, 2026: $1,250,000

The 10 most recent of 134 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Greenwich Village Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
