33 5th Avenue, Manhattan
Co-op · 60 units · built c. 1923 · Block 567, Lot 7.
Building permits
- Alteration, filed Feb 6, 2025, estimated cost $131K, described as “General construction/window revision will be performed in existing unit #10CD on the 10th floor, all as per the submitted plans. Under this application, there will be no changes to use, egress, or occupancy.”
- Alteration, filed Mar 4, 2024, estimated cost $160K, described as “General Construction & Mechanical-related work to facilitate alterations at Apt. 3B. No change to use, egress or occupancy.”
- Alteration, filed Aug 14, 2023, estimated cost $32K, described as “Interior renovation including remove existing non-load-bearing partition between the apartment and corridor; Construct a new fire-rated CMU demising partition. No change to use, egress, or occupancy.”
- Alteration, filed May 12, 2023, estimated cost $162K, described as “Moderate interior renovation to renovate Apt 15 AB on 15 fl non-load bearing partitions, gwb, painting,plaster,tilework,A/C unit, cosmetic finishes. Exterior work, remove window install fixed louver. No change to egress, occupancy or use”
- Alteration, filed Feb 6, 2023, estimated cost $40K, described as “General Construction (Exterior), and Mechanical work of unit 4A on the 4th floor. No change in use, egress, or occupancy”
- Alteration, filed Dec 9, 2022, estimated cost $9K, described as “Installation of new central interior HVAC system filed in connection with apartment combination applicaton filed under job# M08038041-1. No change to use, egress or occupancy.”
- Alteration, filed Dec 7, 2022, estimated cost $15K, described as “Work include capping of existing gas and water lines at 10A kitchen; relocation of gas line and fixtures at kitchen 10B and removal & replacement of existing bathroom fixtures. Relocation of existing fixtures no change to use, egress or…”
- Alteration, filed Dec 7, 2022, estimated cost $102K, described as “Combination of apartments 10A & 10B as per tppn #3/97. Interior partition work, installation of new central interior HVAC system; removal/replacement/relocation of appliances and plumbing fixtures. No change to use, egress or occupancy.”
- Alteration, filed Nov 16, 2022, estimated cost $174K, described as “Moderate interior renovation to combine Apts 14 A & 14 B on 14 fl per tppn 3/97 ,non-load bearing partitions, gwb, painting,plaster,tilework,A/C unit, cosmetic finishes. Exter work, remove window install fixed louver. No change to egress,…”
- Alteration, filed Oct 11, 2022, estimated cost $96K, described as “General construction and Plumbing work of unit 4A on the 4th floor. No change in use, egress, or occupancy.”
- Alteration, filed Aug 11, 2022, estimated cost $32K, described as “Install new gas service, meter and piping.”
- Alteration, filed Aug 11, 2022, estimated cost $140K, described as “Install chimney liner.”
- Alteration, filed Aug 3, 2022, estimated cost $150K, described as “Replace boiler and burner with boiler and gas/oil burner.”
- Alteration, filed May 6, 2022, estimated cost $50K, described as “Plumbing application filed herewith for modification od exist plumbinbg system as per plans replacement of exist plumbing fixtures on exist roughing. No change to use, egress or occupancy.”
- Alteration, filed May 6, 2022, estimated cost $35K, described as “Mechanical application filed herewith for instalation of multizone ac system in apt. 5CD with air handlers, ductwork and associated condensing as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 11, 2022, estimated cost $17K, described as “Interior renovation to an existing medical office on the 1st floor. Work includes removal and replacements of plumbing fixtures. No change of use, occupancy or egress under this application”
- Alteration, filed Apr 11, 2022, estimated cost $47K, described as “Interior renovation to an existing medical office on the 1ST floor. Work includes addition of a non rated partition, mill-work and finishes, floors. Installation. No change of use, occupancy or egress under this application,”
- Alteration, filed Mar 25, 2022, estimated cost $101K, described as “Application filed herewith for interior apartment renovation of apt. 5CD, work to include new finishings and plumbing. No change in use egress or occupancy.”
- Alteration, filed Apr 26, 2021, estimated cost $250K, described as “Herewith filing new ALT2 application for general construction work to be performed in existing unit 14CD on the 14th floor. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.”
- Alteration, filed Mar 3, 2021, estimated cost $45K, described as “Installation of Central HVAC system in apartment 9C/D. No change to egress, use or occupancy.”
- Alteration, filed Mar 2, 2021, estimated cost $30K, described as “Work includes capping of existing gas line at 9D kitchen; installation of new powder room including new bathroom fixtures and removal & replacement of existing bathroom fixtures. No change to egress, use or occupancy.”
- Alteration, filed Mar 2, 2021, estimated cost $150K, described as “Apartment 9C/D Combination. Alteration to include removal of non-load bearing partitions and removal of apartment 9D kitchen. No change to use, egress or occupancy.”
- Alteration, filed Mar 2, 2021, estimated cost $99K, described as “Interior renovation of apt 4B including removal/replacement of non load bearing partitions, flooring, and finishes.”
Property taxes
- Assessment
- $9,581,400
- 2026–27 tax
- $903,248
- Market value (city estimate)
- $21,292,000
- Taxable value
- $8,336,630
- Assessed land
- $729,000
- Assessed improvements
- $8,852,400
Tax breaks
- Co-op and condo abatement, with no end date, a $133,753 credit this tax year.
Zoning
R10: floor area ratio 12.35 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 28, 2025: $1,250,000
- Jan 15, 2025: $5,200,000
- May 8, 2023: $1,835,000
- Nov 9, 2022: $3,800,000
- May 25, 2022: $1,500,000
- May 23, 2022: $1,550,000
- May 20, 2022: $2,100,000
- Feb 15, 2022: $2,595,000
- Feb 15, 2022: $1,925,000
- Dec 22, 2021: $1,100,000
The 10 most recent of 30 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Greenwich Village Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.