30 West 13th Street, Manhattan
Co-op · 29 units · built c. 1900 · Block 576, Lot 22.
Building permits
- Alteration, filed Sep 9, 2026, estimated cost $100K, described as “Miscellaneous exterior repairs throughout exterior facade as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Jul 21, 2026, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 20, 2026, estimated cost $34K, described as “Herewith, filing for window repairs on the north and west side as per plans. No change to use occupancy or egress under this application.”
- Alteration, filed Jan 20, 2026, estimated cost $40K, described as “Herewith filing for window repairs on the north side as per plans. No change to sue, occupancy, or egress under this application.”
- Alteration, filed Apr 7, 2025, described as “Installation of outrigger beam to perform facade repairs and facade inspections”
- Alteration, filed Mar 31, 2025, estimated cost $1K, described as “Installation of roof protection as per plans in complaince with chapter 33 of NYC building code. No change in use, egress or occupancy.”
- Alteration, filed Sep 10, 2024, estimated cost $50K, described as “Structural scope of work consists of a new transfer girder supporting a brick masonry wall as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 3, 2024, estimated cost $28K, described as “General Construction work for Window enlargement at apartment 6C. As per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Aug 12, 2024, estimated cost $376K, described as “Hereby filing facade repairs per plan filed herewith. Repair includes replacement of parapet, brick masonry, Lintel & Still replacement, Existing stone patch and repairs, face brick re-pointing, rear retaining wall repairs.”
- Alteration, filed Mar 31, 2023, estimated cost $1K, described as “Installation of 600# to 1000# capacity material only hoist as per drawings. Hoist shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 13, 2023, estimated cost $6K, described as “Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy”
- Alteration, filed Feb 13, 2023, estimated cost $9K, described as “Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No Change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2023, estimated cost $10K, described as “Installation of pipe scaffold as per chapter 33 of NYCBC. No change in use, egress, or occupancy”
- Alteration, filed Feb 10, 2023, estimated cost $10K, described as “Installation of pipe scaffold as per chapter 33 of NYCBC. No Change in use, egress or occupancy.”
- Alteration, filed Sep 6, 2022, estimated cost $229K, described as “Proposed alteration of dwelling unit 4D.”
- Alteration, filed Apr 13, 2022, estimated cost $106K, described as “Replace/repair facade as necessary to include masonry units, pointing, sill, lintels, stone replacement, coping cover, scrape/prime/paint exposed steel.”
- Alteration, filed Apr 13, 2022, estimated cost $106K, described as “Replace/repair facade as necessary to include masonry units, pointing, sill, lintels, stone replacement, coping cover, scrape/prime/paint exposed steel.”
- Alteration, filed Jan 7, 2022, estimated cost $36K, described as “Installation of gas piping connections to new boilers and water heater. Installation of domestic water lines. No change in egress or occupancy.”
- Alteration, filed Jan 7, 2022, estimated cost $34K, described as “Installation of (1) new low-pressure steam boiler, (1) new low pressure hot water boiler and gas-fired burners for heating. No change in egress or occupancy.”
- Alteration, filed Jan 7, 2022, estimated cost $23K, described as “Gen cons for installation of new hangers, pipe supports for new piping, and supports for boiler eqpt replacement. Firestop wall/ceiling. Install mech piping & chimney exhaust fan to existing liner for (1) lp steam boiler, (1) lp h/w boiler…”
- Alteration, filed Aug 9, 2021, estimated cost $58K, described as “Replacement of existing heating circulator pumps. No change in egress or occupancy.”
Property taxes
- Assessment
- $7,130,250
- 2026–27 tax
- $675,416
- Market value (city estimate)
- $15,845,000
- Taxable value
- $6,135,260
- Assessed land
- $819,000
- Assessed improvements
- $6,311,250
Tax breaks
- Co-op and condo abatement, with no end date, a $88,103 credit this tax year.
Zoning
C6-2 (part of the lot is R6): floor area ratio 5.45 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 21, 2026: $3,812,250
- Aug 13, 2026: $1,625,000
- Nov 24, 2025: $3,625,000
- Aug 4, 2025: $1,450,000
- Apr 14, 2025: $1,645,000
- Jul 25, 2024: $1,650,000
- Jun 6, 2022: $3,955,000
- Jan 21, 2022: $1,575,000
- Jun 30, 2021: $5,959,937
- Dec 16, 2020: $1,390,000, Apt 4D
The 10 most recent of 15 open-market sales since 2016, from the Department of Finance’s sales files.