# 264 Bleecker Street, Manhattan

Two-family with store · built c. 1833 · Block 586, Lot 64.

On Umarelli: https://umarelli.org/nyc/1005860064/264-bleecker-street

More construction in West Village: https://umarelli.org/nyc/manhattan/west-village.md

Every lot on block 586: https://umarelli.org/nyc/manhattan/586.md

## Building permits

- Alteration, filed Dec 14, 2021, estimated cost $40K, described as “Repair bricks at 1st Fl. Provide brick stitching & repointing at 2nd, 3rd, and 4th Fl. Install new beams at 3rd Fl. Sister existing joists & frame new headers at 4th Floor near stairs opening. Sister existing roof rafters and fill existing…”
- Alteration, filed Sep 10, 2021, estimated cost $5K, described as “Installation of a plywood fence as per drawings”
- Alteration, filed Jun 11, 2021, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 11, 2021, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 26, 2020, estimated cost $49K, described as “Installation of plumbing fixtures and piping. No change to use, occupancy or egress.”
- Alteration, filed Oct 21, 2020, estimated cost $20K, described as “Installation of mechanical systems & equipment.”

## Property taxes

- Assessment: $459,720
- 2026–27 tax: $26,290
- Market value (city estimate): $7,662,000
- Taxable value: $132,492
- Assessed land: $147,000
- Assessed improvements: $312,720

## Zoning

R7-2: floor area ratio 2.23 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Greenwich Village Historic District Extension II (Historic District). 6 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- West Village BID Formation (City Planning 2022M0219): Business improvement district, Completed, filed Nov 23, 2021, decided May 4, 2022. (Map shows approximate boundary, please see Public Documents below for exact boundary) An application from the Department of Small Business Services (SBS) on behalf of the proposed West Village Business Improvement District (BID) to form…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
