468 Greenwich Street, Manhattan
Condominium · 12 units · built c. 1920 · Block 595, Lot 7502.
Building permits
- Alteration, filed Aug 27, 2026, estimated cost $90K, described as “Scope of work consist of facade repairs, brick replacement, brownstone replacement/patching, limestone patching, stucco replacement, masonry crack repair, fire escape localized repairs and sill replacement. No change to use, egress, or…”
- Alteration, filed Jul 1, 2026, estimated cost $37K, described as “The scope of work consists of the design of the temporary structural shoring of existing unsafe sidewalk vault, including steel beams, adjustable posts, cross-bracing, and wood sill plates. Permanent vault repairs will be addressed under a…”
- Alteration, filed May 21, 2026, estimated cost $40K, described as “Interior renovation of existing apartment 4S on the 4th floor and interior finishes. General Construction. No change in use, occupancy or egress”
- Alteration, filed Jul 8, 2024, estimated cost $120K, described as “5S: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 1, 2024, estimated cost $50K, described as “Interior renovation of existing apartment 4S on on the 4th floor. General Construction. No change in use, occupancy or egress.”
- Alteration, filed Sep 17, 2021, estimated cost $75K, described as “Replacement of exterior metal chimney on existing concrete pad.”
- Alteration, filed Sep 9, 2021, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 30, 2021, estimated cost $5K, described as “Installation of pipe scaffoldas per plans. Shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Mar 9, 2021, estimated cost $290K, described as “Facade repairs as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 11, 2020, estimated cost $5K, described as “Installation of sidewalk shed as per plans. Sidewalk shed, overhead protection live load will be 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
Property taxes
- Assessment
- $3,932,550
- 2026–27 Tax
- $368,367
- Market value (city estimate)
- $8,738,998
- Taxable value
- $3,586,393
- Assessed land
- $697,500
- Assessed improvements
- $3,235,050
- Condo units with their own tax lots
- 12
Tax breaks
- Co-op and Condo Abatement, with no end date, a $71,223 credit this tax year.
Zoning
C6-2A: floor area ratio 5.77 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Mar 14, 2024: $1,975,000, Apt 1S
- Oct 28, 2022: $2,665,000, Apt 4S
- Dec 1, 2021: $2,460,000, Apt 4S
- Jan 14, 2020: $2,675,000, Apt 1N
- Dec 19, 2019: $1,272,813, Apt 4N
- Apr 6, 2018: $3,100,000, Apt 3N
- May 19, 2017: $2,650,000, Apt 2S
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 468-70 GREENWICH ST (City Planning P1999M0305): Completed, decided Nov 4, 1999. 99DCP043M: SPECIAL PERMIT TO ALLOW RESIDENTIAL USES BELOW THE SECOND FL OOR IN AN M1-5 DISTRICT WHICH WILL CREATE FOUR (4) RESIDENTI AL UNITS