376 West Street, Manhattan
Co-op · 184 units · built 1960 · Block 603, Lot 1.
Building permits
- Alteration, filed Oct 2, 2026, estimated cost $70K, described as “Minor interior renovation of existing apartment 5B on 5TH floor as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Aug 12, 2026, estimated cost $12K, described as “Install new mini-split air-conditioning system at apt# 5A of existing 5-story building with mechanical work only as per plans filed here with. No change in use, egress or certificate of occupancy.”
- Alteration, filed Jul 22, 2026, estimated cost $249K, described as “Interior renovation of unit 4B as per plans. Removing/installing interior partitions and interior finishes. Related mechanical and plumbing work as per plans. No exterior work. No change in use, egress or occupancy. Existing co does not…”
- Alteration, filed Jul 15, 2026, estimated cost $18K, described as “Water/sanitary plumbing work associated with backflow prevention device as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 15, 2026, estimated cost $18K, described as “Water/sanitary plumbing work associated with backflow prevention device as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 15, 2026, estimated cost $18K, described as “Water/sanitary plumbing work associated with backflow prevention device as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 15, 2026, estimated cost $18K, described as “Water/sanitary plumbing work associated with backflow prevention device as per plans. No change in use, occupancy or egress.”
- Alteration, filed May 18, 2026, estimated cost $5K, described as “The proposed work consists of the replacement of an existing roof mounted condensing unit at an existing residential building. Work shall include removal and disposal of the existing unit, installation of the new condenser.”
- Alteration, filed Apr 28, 2026, estimated cost $72K, described as “Propose interior renovation of apartment 2B. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.”
- Alteration, filed Jan 13, 2026, estimated cost $114K, described as “Interior renovation of (1) existing residential unit in a walk-up co-op building.remove and install partitions, remodel the existing kitchen and bathroom. Add a window to exterior facade. No change to occupancy, use or egress.”
- Alteration, filed Oct 17, 2025, estimated cost $29K, described as “Interior reno per plans 1) at 1st Fl. bathroom upgrade along with general construction at bedrooms; and 2) general construction at Basement living/dining area. No change in use, occupancy or egress”
- Alteration, filed Sep 2, 2025, estimated cost $102K, described as “Interior renovation in an exist'g. Duplex apt. "ga": kitchen and bathrooms renovation, windows replacement new bathroom, and install 4TON multi-zone heat pump HVAC unit as per plans submitted, no change of use, egress or occupancy under…”
- Alteration, filed Apr 4, 2025, estimated cost $25K, described as “Renovation of an existing dwelling unit, General Construction work at kitchenette and bathroom as per plans submitted. There is no change to use, egress or occupancy.”
- Alteration, filed Apr 4, 2025, estimated cost $9K, described as “Removal and installation of fixtures, as per plans submitted. There is no change to use, egress or occupancy.”
- Alteration, filed Mar 3, 2025, estimated cost $150K, described as “Renovate apt 4A., includes partition work, replacement of a single window and plumbing work installation. No change in use,egress or occupancy. Pl to be filed as a subsequent application to the general construction.”
- Alteration, filed Feb 14, 2025, estimated cost $35K, described as “Mechanical work for renovations of Apartment Unit 4B for installation of (1) new air-cooled split system.”
- Alteration, filed Feb 3, 2025, estimated cost $102K, described as “Renovate apt GB-Includes modification of existing non bearing walls with new finishes; new window to existing patio; Split system HVAC; new washer/dryer as per the plans filed- no change to use/egress/occupancy under this”
- Alteration, filed Jan 6, 2025, estimated cost $111K, described as “Proposed modification including expansion of the kitchen, the renovation of the bathrooms, the relocation of the washer/dryer, replacement of existing windows, and general finishes throughout. No change in use, egress, or occupancy”
- Alteration, filed Oct 17, 2024, estimated cost $59K, described as “Interior renovation in an exist'g. Apt 1A: kitchen and bathroom renovation, replacement windows in exist'g. Opening, install (5) tons split heat pump (3) zones HVAC unit, floor repair & paint the entire apartmen as per plan. No change in…”
- Alteration, filed Aug 14, 2024, estimated cost $51K, described as “Interior Renovation on 2nd Floor, Apartment 2A - All Work as per Plans”
- Alteration, filed Jul 3, 2024, estimated cost $40K, described as “Renovation of existing apartment #5A with general construction and plumbing works: replace bathroom and kitchen plumbing fixtures,install multi-unit ac system as per plan. No change of use, egress and certificate of occupancy under this…”
- Alteration, filed Jul 3, 2024, estimated cost $40K, described as “Interior renovation of existing apartment #5A with with general construction and plumbing works. No change of use, egress and certificate of occupancy under this application.”
- Alteration, filed Jun 13, 2024, estimated cost $10K, described as “Installation of pipe scaffold at 125 barrow street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Jun 13, 2024, estimated cost $10K, described as “Installation of pipe scaffold at 129 barrow street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jun 13, 2024, estimated cost $10K, described as “Installation of pipe scaffold at 133 barrow street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
63 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $14,308,200
- 2026–27 tax
- $1,509,112
- Market value (city estimate)
- $31,796,000
- Taxable value
- $12,146,975
- Assessed land
- $1,800,000
- Assessed improvements
- $12,508,200
Zoning
C1-6A: floor area ratio 3.23 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Sep 11, 2026: $2,005,000
- Aug 17, 2026: $970,000
- Jul 22, 2026: $1,225,000
- Jun 30, 2026: $1,230,000
- Jun 22, 2026: $1,075,000
- May 20, 2026: $1,047,500
- May 11, 2026: $1,510,000
- Mar 23, 2026: $1,100,000
- Feb 12, 2026: $1,025,000
- Jan 8, 2026: $1,185,000
The 10 most recent of 93 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 125 Perry St Parking Authorization Renewal (City Planning 2024M0418): Completed, filed Aug 5, 2024, decided Feb 6, 2025. An application for a three-year renewal of a CPC authorization (N 220081 CMM) pursuant to ZR § 11-43 to eliminate required accessory off-street parking in the Manhattan Core is being sought by 125 Owners LLC at 738-742 Greenwich Street…