# 110 West 14th Street, Manhattan

Apartment Building · 8 units · built c. 1920 · Block 609, Lot 33.

On Umarelli: https://umarelli.org/nyc/1006090033/110-west-14-street

More construction in West Village: https://umarelli.org/nyc/manhattan/west-village.md

Every lot on block 609: https://umarelli.org/nyc/manhattan/609.md

## Building permits

- Alteration, filed Mar 18, 2026, estimated cost $249K, described as “Proposed interior renovation of partial 5TH floor, unit 5 only.work includes installation of new and replacement/relocation of existing plumbing fixtures, finishes, casework & partitions; installation of new HVAC system & replacement of…”
- Alteration, filed Dec 5, 2024, estimated cost $51K, described as “AT&T - Replacement of existing antennas with removal and installation of RRH units on roof. Retrofit of existing cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Feb 23, 2024, estimated cost $37K, described as “New DISH site: Installation of 3 new antennas sectors with 6 new RRH units 1 new GPS antenna on roof. All work is in compliance with TPPN#/98. No change in use, egress or occupancy.”
- Alteration, filed Sep 12, 2023, estimated cost $10K, described as “Existing Verizon site. Replacement of existing gas piping in service of a generator replacement filed under DOB application no. M00827254-I1.”
- Alteration, filed Sep 12, 2023, estimated cost $38K, described as “Existing Verizon site. Replace (1) generator with 50kW natural gas generator.”
- Alteration, filed May 22, 2020, estimated cost $70K, described as “AT&T - Installation of new equipment platform, antenna sectors (with related RRH units), and equipment cabinets on roof. Installation of new utility service as per plans. All work in compliance with TPPN 5/98. No change to occupancy, use,…”
- Alteration, filed May 21, 2020, estimated cost $15K, described as “Installation of new gas meter and gas piping as per plans. No change to occupancy, use, or egress.”
- Alteration, filed May 21, 2020, estimated cost $45K, described as “Installation of non-emergency gas fired generator with related gas booster on roof. No change to occupancy, use, or egress.”

## Building history

- Alteration, filed May 6, 2014, permit issued - entire job/work, units 8 to 9, described as “Application filed to change use &amp; occupancy of the 9TH floor to apartment.”
- Alteration, filed May 10, 2010, signed off May 14, 2014, units 7 to 8, described as “Application filed for work in conjunction with the change of use for the 4TH floor”
- Alteration, filed Mar 8, 1991, signed off Jan 24, 1994, described as “Loft building to be converted to mixed o ccupancy, commerical and res. As per art. 15 of the NYC zoning resol- ution. This application ia s BSA case and will require a standard denial objec tion. No phyiscal construction to the building is…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $4,524,300
- 2026–27 Tax: $319,995
- Market value (city estimate): $10,054,000
- Taxable value: $2,572,514
- Assessed land: $355,500
- Assessed improvements: $4,168,800

## Zoning

C6-2A: floor area ratio 9.38 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 110 W14TH ST (City Planning P1989M0330): Completed, decided Dec 13, 1990. CHAIRPERSON'S CERT TO LEGALIZE THE CONVERSION OF ALL FLRS IN\*THE 10 STORY BLDG EXCEPT 1 & 4 TO RES USE FLRS 1 & 4 REMAIN\*AS COMMERCIAL TO MEET THE PRESERVATION REQUIREMENT
- 110 WEST 14TH ST (City Planning P1983M1408): Completed, decided Nov 30, 1986. CERT-GRANDFATHERING DETERMINATION (ZR15-215) FOR 1 UNIT IN\*A 10 STORY BLDG
- 110 W14TH ST (City Planning P1983M1164): Completed, decided Nov 5, 1986. CERT-GRANDFATHERING DETERMINATION (ZR15-215) TO LEGALIZE 1\*UNIT IN A 10 STORY BLDG

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
