76 8th Avenue, Manhattan
Commercial · built 2020 · Block 618, Lot 5.
Building permits
- Alteration, filed Aug 30, 2024, estimated cost $29K, described as “Modification of an existing sprinkler system on the cellar and first floor at wells fargo as per plans submitted herewith, no change in use, egress or occupancy group.”
- Alteration, filed Aug 22, 2024, estimated cost $8K, described as “Illuminated non-advertising accessory wall sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed Aug 22, 2024, estimated cost $5K, described as “Illuminated non-advertising accessory wall sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed Aug 22, 2024, described as “Non-illuminated non-advertising double-face projecting accessory sign - wells fargo. No change of use, egress or occupancy.”
- Alteration, filed Jun 28, 2024, estimated cost $80K, described as “HVAC modifications and associated ductwork and related finishes for tenant fit-out (Wells Fargo). There will be no change in use, egress, or occupancy.”
- Alteration, filed Jun 27, 2024, estimated cost $20K, described as “Plumbing modifications and new fixtures with associated piping for tenant (Wells Fargo) fit-out. There will be no change in use, egress, or occupancy.”
- Alteration, filed Jun 26, 2024, estimated cost $500K, described as “Removal and installation of interior non-load bearing partitions and related finishes for tenant (Wells Fargo) fit-out for a new Bank. There will be no change in use ,egress, or occupancy.”
- Alteration, filed Jun 28, 2022, estimated cost $60K, described as “New mechanical work for tenant fit-out. No change in sue egress or occupancy”
- Alteration, filed Jun 27, 2022, estimated cost $126K, described as “Hereby filing for new sprinkler heads and piping for tenant fit out on floors 3RD,4TH, 6TH, 7TH & 8TH. No change in use egress or occupancy”
- Alteration, filed Jun 27, 2022, estimated cost $21K, described as “New plumbing fixtures for tenant fit out on floors 3RD, 4TH, 6TH, 7TH & 8TH. No change to use egress or occupancy.”
- Alteration, filed Jun 3, 2022, estimated cost $100K, described as “Hereby filing for interior tenant fit-out for office space on extsting on 3RD,4TH,6TH & ,8TH floors, no change in use, bulk, egress or occupancy.”
- Alteration, filed Sep 20, 2021, estimated cost $8K, described as “Installation of temporary safety netting per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 12, 2021, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 17, 2021, estimated cost $50K, described as “Installation of temporary storage of material on top of existing sidewalk shed (Filed separately under application # M00187126 plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy.”
- Alteration, filed Mar 3, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 1, 2021, estimated cost $1K, described as “Hereby filing mechanical work for proposed emergency generator filed in conjunction with NB #121192690”
- Alteration, filed Mar 1, 2021, estimated cost $1K, described as “Hereby filing for installaton of fuel oil tank for proposed emergency generator, filed in conjunction with NB #121192690”
- Alteration, filed Feb 11, 2021, estimated cost $1K, described as “Hereby filing for a new steel frame marquee inconjuction with NB#121192690”
- Alteration, filed Jan 16, 2020, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Jul 3, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 28, 2019, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 7, 2018, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Hoist to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Sep 5, 2018, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Hoist to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Sep 5, 2018, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Hoist to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Aug 20, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
5 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $10,534,500
- 2026–27 tax
- $1,142,783
- Market value (city estimate)
- $23,410,000
- Taxable value
- $10,534,500
- Assessed land
- $466,650
- Assessed improvements
- $10,067,850
Zoning
C6-2A: floor area ratio 9.52 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 10, 2026: $50,500,000, 34,364 sq ft ($1,470 per sq ft)
- Mar 12, 2019: $18,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 39-15-BZ): Variance or special permit, Granted, filed Mar 3, 2015, decided Jul 12, 2016. Variance (§72-21) to permit the construction of a new 12 story, 37,166 sq., ft. office building (UG 6) with ground floor retail (UG 6) contrary to floor area (§33-122) and setback requirements (§32-24). C6-2A zoning district.
In the news
76 Eighth Avenue Completes Construction in Greenwich Village, Manhattan, New York YIMBY, Jan 8, 2023.