731 Greenwich Street, Manhattan
Co-op · 56 units · built c. 1911 · Block 632, Lot 45.
Building permits
- Alteration, filed Aug 20, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Apr 27, 2026, estimated cost $6K, described as “Installation of a temporary overhead protection and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Sep 10, 2025, estimated cost $123K, described as “East and north facade restoration at rear of the building at all floors basement, 1-3 and roof. Roof replacement. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 6, 2025, estimated cost $25K, described as “Interior renovation in apartment J39 as noted on plans. No change in use, egress, or occupancy.”
- Alteration, filed Feb 12, 2025, estimated cost $40K, described as “Shoring and bracing of rear wall. No chance to use, egress or occupancy.”
- Alteration, filed Jan 17, 2025, estimated cost $893K, described as “Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.”
- Alteration, filed Oct 10, 2024, estimated cost $118K, described as “Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.”
- Alteration, filed Aug 22, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 17, 2022, estimated cost $5K, described as “Temporary installation of heavy duty sidewalk shed as per drawings during general construction work . No change in use, egress, and occupancy. Sidewalk shed to comply with chapter 33 of the NYC building code of 2014.”
- Alteration, filed Sep 27, 2022, estimated cost $107K, described as “Work at 729A through 729D greenwich street. Replace roof, restore parapets and chimneys, replace roof hatches. No change to use, egress or occupancy under this application.”
- Alteration, filed Jun 7, 2022, estimated cost $97K, described as “Minor partitions and ceilings in apt J11, J13 and J15 as per plans filed herewith. Plumbing is ordinary repair as per 28-105.4.2. No change in use, egress or occupancy”
- Alteration, filed May 26, 2022, estimated cost $78K, described as “Roof membrane replacement, new skylights and work as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed May 26, 2022, estimated cost $12K, described as “Structural work for roof repairs, parapet work and skylights as per plans filed herewith.”
- Alteration, filed Jun 29, 2021, estimated cost $15K, described as “Plumbing work filed for new and relocated plumbing fixtures as per plans, at existing apt J38 on the first floor, no change of use, occupancy or egress”
- Alteration, filed Jul 9, 2020, estimated cost $11K, described as “Installation of bathroom and kitchen plumbing fixtures in Apt JA22. No change of use, egress or occupancy under this application.”
- Alteration, filed Aug 8, 2019, estimated cost $5K, described as “Installation of pipe scaffold (on front facade)”
- Alteration, filed Aug 8, 2019, estimated cost $5K, described as “Installation of pipe scaffold (on front facade)”
- Alteration, filed Aug 6, 2019, estimated cost $5K, described as “Sidewalk shed installation”
- Alteration, filed Jun 8, 2018, estimated cost $5K, described as “Erect, maintain & dismantle of scaffold & hoist for facade repairs as per drawings attached herewith”
Property taxes
- Assessment
- $3,417,300
- 2026–27 tax
- $354,468
- Market value (city estimate)
- $7,594,000
- Taxable value
- $3,070,035
- Assessed land
- $774,000
- Assessed improvements
- $2,643,300
Tax breaks
- Co-op and condo abatement, with no end date, a $27,699 credit this tax year.
Zoning
R6: floor area ratio 2.34 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 23, 2025: $450,010
- Jan 31, 2025: $655,000
- Jun 24, 2024: $459,000
- Dec 11, 2023: $475,000
- Jun 27, 2023: $465,000
- Jan 10, 2023: $670,000
- Jul 11, 2022: $475,000
- Mar 28, 2022: $1,999,999
- Dec 30, 2021: $500,000
- Oct 21, 2021: $1,125,000
The 10 most recent of 24 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Greenwich Village Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.