# 1 Pier 63, Manhattan

Pier or dock · built 1940 · Block 662, Lot 2.

On Umarelli: https://umarelli.org/nyc/1006620002/1-pier-63

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 662: https://umarelli.org/nyc/manhattan/662.md

## Building permits

- Alteration, filed Jun 27, 2024, estimated cost $8K, described as “Installation of temp performance platform.no alt to exist structures for Annual NBC Universal 4th of July Coverage. TPA permit not required. Producer responsible to monitor site safety & implement HWAP.”
- No Work, filed Jun 24, 2024, described as “Fireworks 4th of July Viewing Party”
- Alteration, filed Jun 21, 2024, estimated cost $8K, described as “Installation of temp tents platform tents.no alt to exist structures for Annual Macy's July 4th Celebration. TPA permit required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event…”
- No Work, filed Oct 25, 2023, described as “I am respectfully submitting this TPA application for a fundraising fun run event for Lungevity - a lung cancer awareness organization. The event will be held Saturday, November 4 from 8:30am to 1pm. The event will be outside and limited…”
- Alteration, filed May 16, 2023, estimated cost $5K, described as “Installation of temporary tents and a platform, no alt to exist structures for the Annual Hudson River Dance Festival. A TPA permit is not required. Producer is responsible to monitor site safety & implement HWAP.”
- Alteration, filed May 17, 2022, estimated cost $5K, described as “Installation of temporary tents and a platform. no alt to exist structures for the Annual Hudson River Dance Festival A TPA permit is not required. Producer is responsible to monitor site safety & implement HWAP.”
- No Work, filed Oct 27, 2021, described as “Fund raising event - 3K walkathon on hudson river park, culminating at pier 63 for speeches, exhibits and refreshments - saturday, november 6, 8:30AM - 1:00PM”
- No Work, filed Sep 13, 2019, described as “Fund raising event - 3K walkathon on hudson river park, culminating at pier 63 for speeches, exhibits and refreshments - saturday, october 26, 8:30AM - 1:00PM”

## Property taxes

- Assessment: $9,421,650
- Market value (city estimate): $20,937,000
- Taxable value: $0
- Assessed land: $3,807,000
- Assessed improvements: $5,614,650

## Zoning

M2-3: floor area ratio 0.22 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 16 ft (NAVD88).

## Board and land use applications

- FRYING PAN (City Planning P2003M0366): Completed, decided May 16, 2003. CERT TO WAIVE THE WATERFRONT PUBLIC ACCESS & VISUAL CORRIDOR\*REQUIRMENT FOR THE FORMER COAST GUARD LIGHTHOUSE/FRYING PAN
- BASKETBALL CITY OF N.Y. (City Planning P1996M0069): Completed, decided Apr 3, 1996. AUTH TO MODIFY THE WATERFRONT PUBLIC ACCESS & VISUAL\*CORRIDOR REQUIREMENT

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology