111A 11th Avenue, Manhattan
Pier or dock · built c. 1908 · Block 662, Lot 11.
Building permits
- Alteration, filed Jun 29, 2026, estimated cost $199K, described as “Interior demolition and construction for staff locker room renovation @ Pier 60”
- No Work, filed Jun 25, 2026, described as “Don Julio and FIFA sponsored event with live music, live streaming of matches and food and beverage, for invited guests only with monitored entry.”
- Alteration, filed Jun 22, 2026, estimated cost $8K, described as “Install of temp tent, platform, scenic element, no alt to exist structures for Don Julio Port of Champions. A TPA is req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event completion”
- Alteration, filed Jun 15, 2026, estimated cost $506K, described as “General construction work for Suite 300 @ Pier 62”
- Alteration, filed Jun 15, 2026, estimated cost $60K, described as “Mechanical work for Suite 300 @ Pier 62”
- Alteration, filed Jun 15, 2026, estimated cost $55K, described as “Plumbing work for for Suite 300 @ Pier 62”
- Alteration, filed Mar 23, 2026, estimated cost $5K, described as “Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Mar 16, 2026, described as “Conference, with lectures and reception.”
- No Work, filed Mar 3, 2026
- Alteration, filed Jan 14, 2026, estimated cost $45K, described as “General construction for new laundry room as accessory use for existing Pier 61 Banquet Hall”
- Alteration, filed Nov 21, 2025, estimated cost $150K, described as “Plumbing work for Swim Center at Pier 60 (Headhouse Center)”
- Alteration, filed Nov 19, 2025, estimated cost $125K, described as “Sprinkler work for Swim Center at Pier 60 (Headhouse Center)”
- Alteration, filed Nov 19, 2025, estimated cost $300K, described as “Mechanical work for Swim Center at Pier 60 (Headhouse Center)”
- Alteration, filed Oct 20, 2025, estimated cost $85K, described as “Renovation of existing Switchgear Room at Pier 60”
- Alteration, filed Oct 17, 2025, described as “Hands-on inspection of structure above roof line”
- Alteration, filed Oct 16, 2025, estimated cost $3K, described as “Install exterior illuminated wall sign (PIER59 studios)”
- Alteration, filed Oct 10, 2025, estimated cost $250K, described as “Structural work during replacement of RTU units for Sky Rink at Pier 61”
- Alteration, filed Oct 10, 2025, estimated cost $1.9M, described as “Replacement of 2 ice rink rooftop units with 2 desiccant rooftop units to serve the ice rinks. Replacement of 1 roof with a rooftop heat pump unit to serve the locker rooms for Sky Rink at Pier 61”
- Alteration, filed Oct 10, 2025, estimated cost $8K, described as “Plumbing gas work for replacement of RTU units for Sky Rink at Pier 61”
- Alteration, filed Sep 22, 2025, estimated cost $149K, described as “Structural framing associated with interior renovation & new facade along a portion of the perimeter. Partial demolition of bldg. interior & non-load bearing exterior perimeter wall, using handheld demolition devices”
- Alteration, filed Sep 22, 2025, estimated cost $833K, described as “Interior and exterior demolition and construction for existing commercial space at Pier 60 (Headhouse Center)”
- Alteration, filed Jul 22, 2025, estimated cost $168K, described as “Ground floor entry renovation at Headhouse North”
- No Work, filed Jun 6, 2025
- No Work, filed Apr 8, 2025, described as “Event for with food, beverage and lectures in the Pier 60 Parking lot, accessory to events elsewhere in Chelsea Piers. The event area parking lot shall have no vehicles driving or idling during the event, except for EMT. The parking lot is…”
- Alteration, filed Dec 24, 2024, estimated cost $200K, described as “RTU replacement on Pier 61”
70 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $13,349,700
- Market value (city estimate)
- $29,666,000
- Taxable value
- $0
- Assessed land
- $2,469,600
- Assessed improvements
- $10,880,100
Zoning
M2-3: floor area ratio 0.29 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).
Board and land use applications
- Dewitt Clinton Park North (801 Eleventh Avenue) (City Planning 2024M0244): Special permit, Zoning map change, Zoning text change, Completed, filed Aug 20, 2025, decided Jul 16, 2026. A private application sought by 801 11th Avenue LLC for a zoning map amendment from M2-3 to C4-7, a zoning text amendment to map Special Hudson River Park District and MIH area, and a special permit pursuant to ZR section 89-21 to…
- Dewitt Clinton Park North (629 West 54th Street) (City Planning 2023M0213): Zoning map change, Special permit, Zoning text change, Completed, filed Aug 14, 2025, decided Jul 16, 2026. A private application by 760 12th LLC for a zoning map amendment from M2-4 to C4-7, a zoning text amendment to map a Special Hudson River Park District and MIH area, and a special permit pursuant to ZR 89-21 to facilitate a new 44-story,…
- 606 West 30th Street (Block 675 - Lalezarian) (City Planning P2017M0157): Completed, decided Sep 4, 2019. Zoning text amendment (MIH), zoning map amendment, and special permit pursuant to the Special Hudson River Park District to facilitate a 207,375 sf mixed use development within an M2-3 district.
- CHELSEA PIERS, SUITE 303 (City Planning P2007M0105): Completed, decided Nov 9, 2006. CERT THAT NO PUBLIC ACCESS & VISUAL CORRIDORS ARE REQUIRED*TO EXPAND OFFICE SPACE
- CHELSEA PIERS/PIER 62 (City Planning P1996M0005): Completed, decided Aug 24, 1995. CERT FOR COMPLICANCE W/THE WATERFRONT PUBLIC ACCESS REQUIRE-*MENTS FOR THE CHELSEA PIERS SPORTS & ENTERTAINMENT COMPLEX