## Building permits

- Alteration, filed May 22, 2024, described as “Facade Restoration Work”
- Alteration, filed Jan 30, 2024, described as “Facade Repair”
- Alteration, filed Sep 8, 2023, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. In conjunction with NB# 121204874”
- Alteration, filed Apr 25, 2023, estimated cost $1K, described as “Installation of new boilers in new building on the 46TH floor. Installation of new vents for boiler from 46TH floor to roof. Installation of ducted combustion air intake to boilers on 46TH floor.”
- Alteration, filed Dec 7, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 5, 2022, estimated cost $7K, described as “Installation of pipe scaffolding as per plans. Scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 30, 2022, estimated cost $9K, described as “Use of mini crane during major alteration, filed separately under 121204874”
- Alteration, filed Sep 20, 2022, estimated cost $9K, described as “Use of mini crane during major alteration, filed separately under 121204874”
- Alteration, filed Aug 26, 2022, estimated cost $2K, described as “Installation of temporary overhead protection at adjacent property during NB const, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 18, 2022, estimated cost $5K, described as “Suspended scaffold as shown on plans”
- Alteration, filed Nov 22, 2021, estimated cost $15K, described as “Installation of dual 6500# capacity personnel/material hoists during NB filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elev appl sub to elev dept.”
- Alteration, filed Nov 8, 2021, estimated cost $2K, described as “Installation of temporary plywood fence as per drawings. Plywood fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Fence installed on sidewalk/roadway. Dot permits by others.”
- Alteration, filed Nov 8, 2021, estimated cost $3K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Shed installed on roadway. Dot permits by others.”
- Alteration, filed Oct 26, 2021, estimated cost $1K, described as “Temporary standpipe work in conjunction with NB # 121204874.”
- Alteration, filed Oct 21, 2021, estimated cost $1K, described as “Installation and use of temporary exterior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 21, 2021, estimated cost $1K, described as “Installation and use of temporary platforms as per plan filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 8, 2021, estimated cost $1K, described as “PAA is being submitted to update the 21st and 44th floor "fire pump" to "special service pump" under scope of work tab as shown on previously approved plans.”
- Alteration, filed Jul 20, 2020, estimated cost $1K, described as “Underground plumbing work as shown on plans in conjunction with NB # 121204874.”
- Alteration, filed Feb 6, 2020, estimated cost $1K, described as “Application filed for installation of curb cut in conjunction with alt-1# 121204874”
- Alteration, filed Jan 27, 2020, estimated cost $1K, described as “Construction fence in conjunction w/NB #121204874.”
- Alteration, filed Jun 19, 2019, estimated cost $4K, described as “Construction fence filed in conjunction with demolition application number 123397957”
- Alteration, filed Jun 11, 2019, estimated cost $4K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
- Alteration, filed Mar 9, 2019, estimated cost $8K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
- Alteration, filed Feb 1, 2019, estimated cost $400, described as “Consruction fence filed in conjunction with demolition application number 123397948”

## Property taxes

- Assessment: $50,071,500
- 2026–27 tax: $271,571
- Market value (city estimate): $111,270,000
- Taxable value: $2,183,220
- Assessed land: $1,680,750
- Assessed improvements: $48,390,750

## Tax breaks

- 421-a exemption, through Jun 30, 2060, about $5,956,823 a year below the full tax.

## Zoning

C6-4X: floor area ratio 17.50 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- 606 W 30th Street - 89-21(d) chair cert (City Planning 2019M0254): Completed, filed Sep 5, 2019, decided Nov 15, 2019. This is a private application by Lalezarian Properties requesting Chairperson Certifications \[ZR Section 89-21(d)\] to facilitate a new 12-FAR mixed-use development and the transfer of development rights from Hudson River Park, at 606 West…
- 606 West 30th Street (Block 675 - Lalezarian) (City Planning P2017M0157): Completed, decided Sep 4, 2019. Zoning text amendment (MIH), zoning map amendment, and special permit pursuant to the Special Hudson River Park District to facilitate a 207,375 sf mixed use development within an M2-3 district.
- DOS DIST NO.6 GARAGE (City Planning P1999M0028): Completed, decided Mar 22, 1999. ACQUISITION OF A 1-STORY BRICK BLDG, A 2-STORY PREFABRICATED\*BLDG & A LOT TO CONTINUE TO PROVIDE SANITATION SERVICES
- MANH SANITATION DIST GARAGE #6 (City Planning P1997M0445): Completed, decided Jul 20, 1998. ACQUISITION OF A 1-STORY BLDG W/MEZZANINE TO CONTINUE PRO-\*VIDING SANITATION SERVICES & STORAGE FOR EQUIPMENT
- MANHATTAN SANITATION DIST 6 GARAGE (City Planning P1996M0362): Completed, decided May 5, 1997. ACQUISITION OF A 1-STORY BLDG WITH A MEZZANINE & A 2 STORY\*MODULAR BLDG TO CONTINUE TO OPERATE THE GARAGE & OFFICE &\*PROVIDE SANITATION SERVICES
- BOROUGH REPAIR SHOP (City Planning P1991M0338): Completed, decided Dec 22, 1992. 91-186M: ULURP-RELATED TO CONTINUE TO LEASE FACILITY UNTIL CONSTRUC- TION OF NEW REPAIR SHOP
- W30TH ST BOROUGH REPAIR SHOP/PK LOT (City Planning P1987M0457): Completed, decided Jan 28, 1988. 87-177M: CONTINUE TO LEASE REPAIR SHOP FACILITY UNTIL THE COMPLETION OF CONST OF A NEW REPAIR SHOP. TB675. TL39.
- 606 W30TH ST (City Planning P1985M0096): Completed, decided Oct 11, 1984. CONDEMNATION LEASE HOLD PROCEEDINGS FOR MANHATTAN DS BORO\*REPAIR SHOP. PROPERTY WAS UNDER LEASE. 606 W30TH ST. BL675.\*LOT39.
- 606-16 W30TH ST (City Planning P1981M0029): Completed, decided Jan 29, 1981. LEASE BOROUGH REPAIR SHOP TO MAINTAIN VEHICLES

## In the news

[606 West 30th Street Wraps Up Construction in West Chelsea, Manhattan](https://newyorkyimby.com/2023/12/606-west-30th-street-wraps-up-construction-in-west-chelsea-manhattan.html), New York YIMBY, Dec 18, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology