# 512 West 19th Street, Manhattan

Commercial · built 1946 · Block 690, Lot 40.

On Umarelli: https://umarelli.org/nyc/1006900040/512-west-19-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 690: https://umarelli.org/nyc/manhattan/690.md

## Building permits

- Alteration, filed Apr 25, 2024, estimated cost $8K, described as “Construct a 24'x13'x7.5' deep timber lagging support of excavation work as required for construction of the new elevator on site”
- Alteration, filed Aug 30, 2023, estimated cost $1K, described as “Installation of 49 lf heavy duty sidewalk shed & 8' high construction fence as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Jun 6, 2023, estimated cost $1K, described as “Installation of stair tower scaffold as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Oct 21, 2022, estimated cost $50K, described as “Herewith filing for temp manual dry standpipe”
- Alteration, filed Jan 26, 2022, estimated cost $20K, described as “Herewith filing for interior PL demo work only”
- Alteration, filed Jan 26, 2022, estimated cost $725K, described as “Herewith filing for installation of new sprinkler/standpipe systems and related piping.”
- Alteration, filed Jan 26, 2022, estimated cost $65K, described as “Herewith filing for installation of new fixtures and related piping.”
- Alteration, filed Jan 26, 2022, estimated cost $2.8M, described as “Herewith filing for modifications to existing hvac system including piping and fixtures. No change to use egress or occupancy.”
- Alteration, filed Jan 24, 2022, estimated cost $25K, described as “Related civil PL work for site connections”
- Alteration, filed Jan 21, 2022, estimated cost $25K, described as “Herewith filing new 16.3ft curb cut on south side of west 19th street”
- Alteration, filed Jan 21, 2022, estimated cost $65K, described as “Herewith filing for related civil site work”
- Alteration, filed Jan 21, 2022, estimated cost $2.7M, described as “Herewith filing for modification to buildings structural and foundation elements.”
- Alteration, filed Jan 21, 2022, estimated cost $14.3M, described as “Herewith filing for interior renovation of existing building and updating CO with public assembly spaces and uses.”
- No Work, filed Jan 3, 2020, described as “Theatrical performance @ The Kitchen”
- No Work, filed Jun 18, 2019, described as “Artist exhibition and performance”
- No Work, filed Jun 10, 2019, described as “Artist exhibition and performance”
- No Work, filed May 3, 2019, described as “Annual benefit gala to be held which entails a seated dinner on the first floor and cocktail hour on the 2nd and 3rd floors with standing room only.”

## Property taxes

- Assessment: $1,273,950
- Market value (city estimate): $2,831,000
- Taxable value: $0
- Assessed land: $436,500
- Assessed improvements: $837,450

## Tax breaks

- Nonprofit exemption (nonprofit, use planned), with no end date, about $138,198 a year below the full tax.

## Zoning

C6-2: floor area ratio 3.65 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
