# 525 West 22nd Street, Manhattan

Condominium · 30 units · built c. 1930 · Block 694, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1006947501/525-west-22-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 694: https://umarelli.org/nyc/manhattan/694.md

## Building permits

- Alteration, filed Aug 21, 2025, estimated cost $50K, described as “Renovation of an existing apartment# 3E on the 3rd floor. Work includes non-structural demolition on the third floor.”
- Alteration, filed Jul 25, 2024, estimated cost $202K, described as “In conjunction with Interior renovation of existing unit on the 5th Floor. Plumbing work only.”
- Alteration, filed Jul 25, 2024, estimated cost $586K, described as “Interior renovation of existing apartment. 5 on the 5th Floor Architectural / construction work only.”
- Alteration, filed Jul 22, 2024, estimated cost $70K, described as “Masonry wall repairs at B-line units, as per plans filed herewith. No change in occupancy, use or egress.”
- Alteration, filed Jan 25, 2024, estimated cost $20K, described as “Proposed mechanical work as per plan. No change in use, bulk, egress or occupancy.”
- Alteration, filed Jan 17, 2024, estimated cost $10K, described as “Direct replacement of existing boiler. No change of use, egress, or occupancy under this application.”
- Alteration, filed Jan 17, 2024, estimated cost $62K, described as “Install a new heating/cooling system. No change of use, egress, or occupancy under this application.”
- Alteration, filed Jan 17, 2024, estimated cost $22K, described as “Replacement of bathroom, kitchen, laundry fixtures, and boiler. No change of use, egress, or occupancy under this application.”
- Alteration, filed Jan 16, 2024, estimated cost $81K, described as “Interior renovation of apartment PHE @ 6th and 7th Floor. Removal and replacement of interior partitions and finish work. No change of use egress or occupancy under this application.”
- Alteration, filed May 24, 2023, estimated cost $100K, described as “Structural work associated with roof elevator bulkhead extension. No change in occupancy, use or egress.”
- Alteration, filed Apr 11, 2023, estimated cost $200K, described as “General construction associated with roof elevator bulkhead extension. No change in occupancy, use or egress.”
- Alteration, filed Oct 13, 2021, estimated cost $200K, described as “Filing for General construction modifications to the 1st floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 8, 2021, estimated cost $15K, described as “Filing for sprinkler modifications to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 8, 2021, estimated cost $137K, described as “Filing for Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 1, 2021, estimated cost $10K, described as “Relocation of existing sprinkler heads. No change in occupancy, use or egress.”
- Alteration, filed Mar 16, 2021, estimated cost $75K, described as “Rooftop unit replacement. No change in occupancy, use or egress.”
- Alteration, filed Jan 14, 2021, estimated cost $14K, described as “Plumbing modifications to apt 2E as indicated on plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Jan 14, 2021, estimated cost $26K, described as “Renovation to apt 2E work to include partion, ceiling, and door modifications as indicated on plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 10, 2020, estimated cost $1K, described as “Installation of scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Feb 5, 2020, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Oct 17, 2019, estimated cost $30K, described as “Hereby filing structural work to existing class "a" residential apartment 6F as per plans.”
- Alteration, filed Oct 17, 2019, estimated cost $170K, described as “Hereby filing new installation of mechanical fixtures to existing class "a" residential apartment 6F as per plans.”
- Alteration, filed Oct 17, 2019, estimated cost $60K, described as “Hereby filing new plumbing installations to existing apartment 6F as per plans filed herewith.”

## Building history

- Alteration, filed Oct 14, 1998, permit issued - entire job/work, described as “Renovation and addition of another level to an existing Class "A" apart he penthouse. Work to include partition changes, minor plumbing and structural modifications as per plans filed herewit h.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $14,991,759
- 2026–27 Tax: $1,485,685
- Market value (city estimate): $33,315,002
- Taxable value: $13,242,567
- Assessed land: $2,821,504
- Assessed improvements: $12,170,255
- Condo units with their own tax lots: 34

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $98,679 credit this tax year.

## Zoning

M1-5: floor area ratio 4.55 built, 5.00 allowed by base zoning.

## Recent sales

- Sep 16, 2026: $6,750,000, Unit PH-D
- Aug 10, 2026: $2,700,000, Apt 4B
- Jul 7, 2026: $5,989,000, Apt 5A
- Sep 9, 2025: $7,200,000, Apt 2F
- Jul 21, 2025: $2,500,000, Apt 2B
- May 9, 2024: $4,350,000, Apt 5F
- Mar 15, 2024: $6,400,000, Apt 2F
- Nov 28, 2023: $5,900,000, Unit PH-C
- Sep 20, 2022: $3,850,000, Unit PH-E
- Aug 31, 2022: $3,067,500, Unit PH-B

The 10 most recent of 17 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
