501 West 30th Street, Manhattan
Commercial · built 2017 · Block 702, Lot 10.
Building permits
- Alteration, filed Nov 5, 2026, estimated cost $93K, described as “Alterations to existing commercial space to include non-load bearing demo, partition and finishes work. No change to use, occupancy or egress”
- Alteration, filed Nov 3, 2026, estimated cost $240K, described as “Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2026, estimated cost $1.1M, described as “Bcg floors 43 & 46-- general construction inclusive of interior demolition and installation of non-load bearing partitions as per plans filed. No change to use, egress, or occupancy.”
- Alteration, filed Jul 27, 2026, estimated cost $164K, described as “Interior renovation as per plans filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Jun 22, 2026, estimated cost $135K, described as “Bcg-- interior demolition inclusive of non-loadbearing partitions as per plans filed. No change to use, egress, or occupancy.”
- No Work, filed May 14, 2026
- Alteration, filed Apr 14, 2026, estimated cost $9.4M, described as “Filling herewith for interior demolition and installation of non-load bearing partitions, ceilings, floors, and doors as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Apr 9, 2026, estimated cost $245K, described as “Filling herewith for interior renovations of non-load bearing partitions, ceilings, floors, and doors as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Apr 9, 2026, estimated cost $300K, described as “Filling herewith for interior renovations of non-load bearing partitions, ceilings, floors, and doors as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Nov 25, 2025, estimated cost $120K, described as “Modification to sap experience center on partial 52ND floor. Removal and installation of millwork fixtures, furniture an new non-structural glass guardrail. No change in use, egress or occupancy.”
- Alteration, filed Nov 14, 2025, estimated cost $1.8M, described as “Filing herewith Interior renovation, removal, and installation of non load bearing partitions, ceilings, floors as per plans. No change to use, egress or occupancy”
- Alteration, filed Aug 5, 2025, estimated cost $280K, described as “Filing herewith Interior renovation of non-load bearing partitions, ceilings, doors, and floors as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Jul 22, 2025, estimated cost $107K, described as “Filling herewith for interior renovations of non-load bearing partitions, ceilings, floors, and doors as per plans. No change to use, egress, or occupancy.”
- Alteration, filed Mar 27, 2025, estimated cost $300K, described as “Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 27, 2025, estimated cost $1.0M, described as “Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Mar 26, 2025, estimated cost $5.5M, described as “Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 20, 2025, estimated cost $20K, described as “Filing herewith interior demolition on the 18th FL.(Construction)/22nd FL.(Marketing) as per plans filed herewith. No change to use, egress occupancy”
- No Work, filed Jan 30, 2025, described as “2 Fashion shows, for seated audience and accessory backstage. Floor 33 per TCO, floor 37, marketing.”
- Alteration, filed Oct 7, 2024, estimated cost $1.9M, described as “Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Oct 7, 2024, estimated cost $2.5M, described as “Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2024, estimated cost $600K, described as “Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 26, 2024, estimated cost $863K, described as “Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 26, 2024, estimated cost $4.2M, described as “Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2024, estimated cost $5.9M, described as “Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 3, 2024, estimated cost $80K, described as “Filing herewith drawings showing general construction work on the 21st floor. No change to occupancy, egress.”
87 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $406,021,500
- Market value (city estimate)
- $902,270,000
- Taxable value
- $0
- Assessed land
- $25,904,250
- Assessed improvements
- $380,117,250
Tax breaks
- IDA PILOT, with no end date.
Zoning
C6-4: floor area ratio 22.96 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 1, 2016: $119,885,511
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 10 Hudson Yards (City Planning P2016M0187): Completed, decided Jun 24, 2016. This is a Restrictive Declaration modification to add force majeure to allow DOB to grant Temporary Certificate of Occupancy in spite of 10 HY Plaza not having been substantially completed, as required per 93-70. This also includes a Chair…
- ERY certifications II (City Planning P2014M0363): Completed, decided Apr 1, 2015. This is an application for additional chair certifications for the Eastern Rail Yard site, and updates to previously granted certifications.
- WATER SHAFT 26B (City Planning P1993M0045): Completed, decided Nov 23, 1993. SITE SELECTION & ACQUISITION IN CONJUNCTION WITH CONSTRUC-*TION OF WATER TUNNEL NO.3, STAGE 2, SHAFT 26B