500 West 33rd Street, Manhattan
Condominium · built 2015 · Block 702, Lot 7501.
Building permits
- No Work, filed Nov 20, 2026, described as “Tpa continuation of previously approved tpa applications # M01404814-I1 and M01440526-I1 hye events at the edge / hudson yards 12/07/2026 through 03/06/2027 7:00 am to 3:00 am.”
- Alteration, filed Nov 17, 2026, estimated cost $2.3M, described as “Filing herewith Interior renovation, removal of non load bearing partitions, doors, floors and ceiling as per plans. No change to use, egress or occupancy”
- Alteration, filed Oct 23, 2026, estimated cost $244K, described as “Partition interior removal of existing restaurant space. removal of non-bearing partitions, equipment, fixtures and finishes no change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2026, estimated cost $100K, described as “Re-demise of a portion of retail spaces, partial removal of existing retail demise, tenant storefront and fit out, construction of new partitions, build back floors finishes and ceiling as shown on drawings. No change in use, egress or…”
- Alteration, filed Sep 10, 2026, estimated cost $1.7M, described as “Proposed scope of work enclose existing Climb Attraction. No change to use, egress or occupancy”
- No Work, filed Aug 31, 2026, described as “Town Hall & Reception on 5th and 6th floors on 09/10/26 from 7 AM to 10:00 PM. Floor 05 count is 268 persons (Lecture Hall Layout: 7AM-6PM & Reception Hall Layout 6PM-10PM). Floor 06 - Cafe & Terrace count is 400 persons (7:00 AM - 10:00…”
- Alteration, filed Aug 10, 2026, estimated cost $200K, described as “New interior walls, doors, security grille, floor finishes and lighting as per the plan”
- No Work, filed Aug 5, 2026, described as “Tpa continuation of approved tpa under # M01404814. - hye events at the edge / hudson yards - 9/7/2026 - 12/6/2026 - 7:00 am - 3:00 am 09/07/2026”
- Alteration, filed Jul 28, 2026, estimated cost $1.2M, described as “Modification to existing plumbing,sprinkler and standpipe systems on 44th (64th M) floor. No change in use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $4.6M, described as “Modification to HVAC systems on 44th FL (64M). No change in use egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $28K, described as “Modification to existing structural system on 41st Fl (61M). No change in use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $26K, described as “Modification to structural system on 43rd FL ( 63 M). No change in use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $112K, described as “Modification to existing structural systems on 40th & 42nd Fls (60 & 62M) . No change in use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $882K, described as “Modification to existing plumbing,sprinkler and standpipe systems.”
- Alteration, filed Jul 28, 2026, estimated cost $880K, described as “Modification to existing plumbing,sprinkler and standpipe systems.”
- Alteration, filed Jul 28, 2026, estimated cost $1.7M, described as “Modification to existing plumbing,sprinkler and standpipe systems.”
- Alteration, filed Jul 28, 2026, estimated cost $3.8M, described as “Modification to HVAC systems on 41st Fl (61 M). No change to use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $3.9M, described as “Modification to HVAC systems on 43rd Fl (63 M). No change in use, egress or occupancy.”
- Alteration, filed Jul 28, 2026, estimated cost $7.7M, described as “Modification to HVAC systems on 40th & 42nd Floors (60 & 62 M). No change in use egress or occupancy.”
- Alteration, filed Jul 24, 2026, estimated cost $9.4M, described as “Removal and installation of interior non-bearing partitions and related finishes on 44TH fl (64 m). No change in use, egress or occupancy.”
- Alteration, filed Jul 24, 2026, estimated cost $8.1M, described as “Removal & renovation of interior non-bearing partitions and related finishes as per drawings on 41ST floor (61ST m). No change in use, egress or occupancy.”
- Alteration, filed Jul 24, 2026, estimated cost $9.1M, described as “Removal & renovation of interior non-bearing partitions and related finishes on 43RD fl (63M). No change in use, egress or occupancy.”
- Alteration, filed Jul 24, 2026, estimated cost $19.4M, described as “Removal & renovation of interior non-bearing partitions and related finishes on 40TH and 42ND floors (60TH & 62ND m). No change in use, egress or occupancy.”
- Alteration, filed Jul 21, 2026, estimated cost $160K, described as “Interior renovation of existing commercial space, new eating and drinking establishment, new walls, floors and ceiling finishes.”
- Alteration, filed Jul 11, 2026, estimated cost $60K, described as “Installation of new sprinkler heads and related piping for PIZZA SHOP as shown on drawings. No change in use, egress or occupancy. GC/ST#M01420714, MH#M0142484, PL#M01421487.”
402 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $764,317,801
- Market value (city estimate)
- $1,698,483,998
- Taxable value
- $0
- Assessed land
- $58,004,101
- Assessed improvements
- $706,313,700
- Condo units with their own tax lots
- 9
Tax breaks
- IDA PILOT, with no end date.
Zoning
C6-4: floor area ratio 16.21 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Nov 22, 2023: $24,268,587, Apt OF2
- Nov 13, 2019: $17,249,081, Unit RHY
- Jun 14, 2019: $2,155,000,000, Unit TW
- May 20, 2019: $19,534,429, Apt PE1
- May 20, 2019: $4,534,063, Apt PE2
- May 20, 2019: $34,118,367, Unit WF
- Apr 15, 2019: $98,659,019, Unit TW
- Apr 15, 2019: $2,897,878, Unit OX
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- ERY Plaza Substantial Completion Certification (City Planning 2019M0289): Completed, filed Mar 4, 2019, decided May 22, 2019. Chair Certification pursuant to ZR 93-70 for the Substantial Completion of the Eastern Rail Yards Plaza in Hudson Yards.
- ERY certifications II (City Planning P2014M0363): Completed, decided Apr 1, 2015. This is an application for additional chair certifications for the Eastern Rail Yard site, and updates to previously granted certifications.