# 515 West 36th Street, Manhattan

Apartment Building · 251 units · built 2016 · Block 708, Lot 20.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1007080020/515-west-36-street

More construction in Hudson Yards: https://umarelli.org/nyc/manhattan/hudson-yards.md

Every lot on block 708: https://umarelli.org/nyc/manhattan/708.md

## Building permits

- Alteration, filed Dec 22, 2025, estimated cost $297K, described as “Interior renovation in existing 1ST fl commercial space for proposed grocery & convenience retailer w/ commercial cooking. New commercial hood with exhaust. New condensers. Plumbing work to be filed subsequently.”
- Alteration, filed Nov 13, 2024, described as “Added additional hoists and outrigger beams in other locations.”
- Alteration, filed Jun 10, 2024, estimated cost $175, described as “Install non-illuminated double faced wall sign on existing overhang (northwell health)”
- Alteration, filed Jun 10, 2024, estimated cost $175, described as “Install non-illuminated double faced wall sign on existing overhang (northwell health)”
- Alteration, filed Jun 10, 2024, estimated cost $400, described as “Install illuminated wall sign (northwell health)”
- Alteration, filed Mar 11, 2024, estimated cost $5K, described as “Installation of pipe scaffolding and roof protection as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Dec 3, 2023, estimated cost $5K, described as “Installaton of clean agent \[novec-1230\] fire suppression system for mdf room on the marketing 4TH fl. / construction 3RD fl.”
- Alteration, filed Aug 4, 2023, estimated cost $1K, described as “Installation of roof protection as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jun 30, 2023, estimated cost $60K, described as “Proposed renovation of existing space. Reuse of existing water source heat pump system connected to new ductwork distribution. All work as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 28, 2023, estimated cost $25K, described as “Hereby filing interior alteration and renovation of existing first floor lobby. No change to use occupancy or egress.”
- Alteration, filed Mar 17, 2023, estimated cost $11K, described as “Hereby filing for the installation of mechanical equipment. No change in use, egress or occupancy.”
- Alteration, filed Feb 20, 2023, estimated cost $8K, described as “Filing application for new MDF room at existing third floor office. No change in use, egress, or occupancy.”
- Alteration, filed Dec 21, 2022, estimated cost $45K, described as “Hereby filing structural work in cojunction with interior renovation of 6TH floor. No change to use occupancy or egress.”
- Alteration, filed Dec 19, 2022, estimated cost $45K, described as “Hereby filing for the installation, relocation and installation of sprinkler heads, no change to use occupancy or egress.”
- Alteration, filed Dec 19, 2022, estimated cost $50K, described as “Hereby filing for the installation of mechanical equipment. No change to use occupancy or egress.”
- Alteration, filed Dec 19, 2022, estimated cost $30K, described as “Hereby filing for the installation of plumbing fixtures. No change to use occupancy or egress.”
- Alteration, filed Dec 16, 2022, estimated cost $75K, described as “Interior alteration and renovation of existing tenant space no change to use occupancy or egress.”
- Alteration, filed Nov 3, 2022, estimated cost $50K, described as “Installation of sprinkler heads. No change to use occupancy or egress”
- Alteration, filed Sep 1, 2022, estimated cost $65K, described as “Hereby filing for the installation of mechanical equipment. No change to use occupancy or egress.”
- Alteration, filed Sep 1, 2022, estimated cost $50K, described as “Hereby filing for the installation of plumbing fixtures. No change to use occupancy or egress.”
- Alteration, filed Aug 22, 2022, estimated cost $100K, described as “Interior alteration and renovation of existing tenant space to new medical space at 5TH floor. No change to use occupancy or egress.”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed May 7, 2018, described as “Installation of system pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 18, 2017, estimated cost $5K, described as “Installation of scaffold as per plans in conjunction with NB construction. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”

## Building history

- New Building — Tower, filed Sep 24, 2014, permit issued - entire job/work, 251 units, 39 stories
- Demolition, filed Apr 10, 2013, signed off Jun 4, 2014, units 6 to 0, stories 5 to 0, described as “Full demolition of five story building using mechanical means.”
- Alteration, filed Dec 12, 2003, signed off Mar 3, 2011

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $62,493,300
- 2026–27 Tax: $988,894
- Market value (city estimate): $138,874,000
- Taxable value: $7,949,944
- Assessed land: $4,693,500
- Assessed improvements: $57,799,800

## Tax breaks

- 421-a exemption, through Jun 30, 2055, about $6,164,193 a year below the full tax.

## Zoning

C2-8: floor area ratio 14.48 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 25-05-BZ): Variance or Special Permit, Withdrawn, filed Feb 11, 2005, decided Sep 20, 2005. Variance (§72-21) to permit legalization of three residential units in an existing four-story and penthouse level mixed-use building.
- 36 Hudson - Parking (City Planning P2017M0131): Completed, decided Jul 19, 2019. HUDSON 36 LLC requests certification with respect to 36 Hudson Boulevard pursuant to Section 93-821(e) to allow a 64-space accessory off-street parking facility in connection with new mixed-use building.
- Block 4 - Contribution-in-Kind Lot 17 (City Planning P2018M0293): Completed, decided May 31, 2019. Contribution in Kind Authorization pursuant to Section 93-32(b) for Lot 17 on Block 4 of the Hudson Boulevard and Park in the Special Hudson Yards District.
- Hudson Boulevard and Park Text Amendment (City Planning P2018M0082): Completed, decided Jun 12, 2018. This is a Text Amendment application by the Department of City Planning to Section 93-32 of the Special Hudson Yards District to modify requirements for floor area transfers and the contribution in kind authorization for Phase 2 of Hudson…
- 36 Hudson Boulevard (DIB & Hudson Park transfer) (City Planning P2015M0358): Completed, decided Jun 5, 2015. This is a private application for a Hudson Yards District Improvement Bonus Chair Certification pursuant to ZR 93-31 and a Chair Certification to transfer floor area from two lots in the Hudson Boulevard and Park pursuant to ZR 93-32(a).
- 521, 525 W36TH ST (City Planning P1998M0063): Completed, decided Jan 24, 1998. SPECIAL PERMIT TO CREATE TWO PUBLIC PARKING GARAGES ON THE\*GROUND FLR OF EACH BLDG, EACH GARAGE WILL HAVE 10 SPACES,\*2 RESERVIOR SPACES & AN ATTENDANT'S BOOTH

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
