47 9th Avenue, Manhattan
Commercial · built c. 1923 · Block 712, Lot 29.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Sep 15, 2026, estimated cost $55K, described as “Modification to Plumbing Systems as per plans filed herewith.”
- Alteration, filed Sep 15, 2026, estimated cost $160K, described as “Modification to Mechanical systems as per plans filed herewith.”
- Alteration, filed Sep 14, 2026, estimated cost $5K, described as “Interior mechanical demo renovation as per plans. No change in egress, occupancy, or use.”
- Alteration, filed Sep 14, 2026, estimated cost $2K, described as “Interior plumbing demo renovation as per plans. No change in egress, occupancy, or use.”
- Alteration, filed Sep 10, 2026, estimated cost $1.1M, described as “Interior renovation as per plans filed herewith.”
- Alteration, filed Sep 10, 2026, estimated cost $15K, described as “Structural Modification as per plans filed herewith.”
- Alteration, filed Sep 4, 2026, estimated cost $44K, described as “Demo Interior renovation as per plans filed herewith.”
- No Work, filed Mar 27, 2025, described as “Lexus NYC pop-up.”
- Alteration, filed Aug 29, 2024, estimated cost $310K, described as “Alteration of sprinkler head locations & piping. Remove existing fire hose cabinet. Modify piping to allow for the Installation of new door opening. Extend piping and connect to new fire hose cabinet. Alteration of plumbing piping to serve…”
- Alteration, filed Aug 28, 2024, estimated cost $200K, described as “New openings in non load bearing cold form steel stud walls, 3" topping slab on 1st floor, 9" raised cold form steel raised floor on 1st floor and Infill existing cold form steel stud wall openings.”
- Alteration, filed Aug 28, 2024, estimated cost $800K, described as “Revisions are to the mechanical schedules and updated EUP units.”
- Alteration, filed Aug 28, 2024, estimated cost $1.5M, described as “The OT PAA issuance incorporates all updates made after Revision 4 (Delta 3, dated 11.17.2025), including revisions to drawings, layouts, partitions, signage, finishes, dimensions, details, and lighting. Both a complete revised drawing set…”
- Alteration, filed May 15, 2024, estimated cost $1.1M, described as “Modifications to the existing HVAC system corresponding with the new architectural program, replacement of all water source heat pumps.”
- Alteration, filed May 15, 2024, estimated cost $235K, described as “Modifications to existing sprinkler system and new piping distribution from existing plumbing stacks and risers to new fixtures corresponding with new architectural layouts.”
- Alteration, filed May 15, 2024, estimated cost $2.4M, described as “The renovation scope of work entails the interior renovation of an existing office space. No change to use, egress, or occupancy.”
- Alteration, filed Dec 13, 2023, estimated cost $200K, described as “Modification to existing Mechanical/HVAC systems as per plans filed herewith. No change in use, egress or occupancy.”
- No Work, filed Mar 24, 2023, described as “Consumer marketing event with carnival amusements and food and beverage service. For invited guests only with timed entry.”
- Alteration, filed Feb 20, 2023, estimated cost $7K, described as “Apple store restroom upgrades - work to include modification of an existing sprinkler system. No change to use, egress and/or occupancy.”
- Alteration, filed Feb 10, 2023, estimated cost $750, described as “Filing to correct the certificate of compliance information listed on the signed off filing for work (M00493083). Said certificate is missing the doas unit. No change to use, egress, or occupancy. No work under this filing.”
- Alteration, filed Dec 27, 2022, estimated cost $400K, described as “Restroom upgrades (apple store) work to include partition, ceiling and door modifications as indicated on plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 22, 2022, estimated cost $100K, described as “Restroom upgrade (apple store) work to include plumbing modifications as indicated on plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 22, 2022, estimated cost $30K, described as “Restroom upgrade (apple store) work to include mechanical modifications as indicated on plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 2, 2022, estimated cost $2K, described as “Installation of fence enclosure as per drawings. Fence enclosure shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 28, 2022, estimated cost $90K, described as “Replacement of HVAC system throughout existing commercial tenant space. No change to use, egress, or occupancy.”
- Alteration, filed Mar 23, 2022, estimated cost $1K, described as “Installation and removal of sprinkler fixtures as per plans filed herewith. No change of use, egress, or occupancy under this application.”
9 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $29,824,200
- 2026–27 tax
- $3,230,654
- Market value (city estimate)
- $66,276,000
- Taxable value
- $29,781,100
- Assessed land
- $648,000
- Assessed improvements
- $29,176,200
Zoning
M1-5: floor area ratio 4.33 built, 5.00 allowed by base zoning.
Landmarks
Part of Gansevoort Market Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- MARKT (City Planning P2001M0627): Completed, decided Jun 29, 2001. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 52 SEATS FOR 5-YEARS
- MARKT (City Planning P2000M0441): Completed, decided Sep 23, 1999. NEW-UNENCLOSED SIDEWALK CAFE, WITH 50 SEATS