# 2 Manhattan West, Manhattan

Condominium · built 2020 · Block 729, Lot 7505.

On Umarelli: https://umarelli.org/nyc/1007297505/2-manhattan-west

More construction in Hudson Yards: https://umarelli.org/nyc/manhattan/hudson-yards.md

Every lot on block 729: https://umarelli.org/nyc/manhattan/729.md

## Building permits

- Alteration, filed Oct 15, 2026, estimated cost $50K, described as “General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.”
- Alteration, filed Aug 26, 2026, estimated cost $78K, described as “General construction for elevator bank modifications, as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 10, 2026, estimated cost $5.2M, described as “Interior renovation of partitions, ceilings and doors for office tenant on 10C/11M floor. No change in use, egress or occupancy.”
- Alteration, filed Jun 24, 2026, estimated cost $6.0M, described as “Selective demolition and interior alteration for new office tenant. Work to include new non-loading bearing partitions, finishes opening protectives and fixtures. No change in use, egress or occupancy,”
- Alteration, filed Apr 21, 2026, estimated cost $1.3M, described as “General construction as shown on plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $3.5M, described as “General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.”
- Alteration, filed Mar 18, 2026, estimated cost $9.0M, described as “Interior construction of existing business class occupancy of the 6TH (7TH marketing) floor of this building. Installation of new non-load bearing partitions, ceilings, light fixtures. No change in use, egress or occupancy.”
- Alteration, filed Mar 3, 2026, estimated cost $520K, described as “General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.”
- Alteration, filed Jan 22, 2026, estimated cost $174K, described as “Modifications to existing HVAC system equipment and related piping for existing office tenant. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2025, estimated cost $6.7M, described as “Interior fit-out for new tenant including selective demolition of existing base building walls & doors; construction to include new open workspace, enclosed offices, accessory meetings rooms. No change in use, egress or occupancy.”
- Alteration, filed Dec 17, 2025, estimated cost $106K, described as “Modifications to existing SP system as shown on plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $5.3M, described as “General Construction as shown on plans”
- No Work, filed Jul 3, 2025
- No Work, filed Jul 3, 2025
- No Work, filed Jul 3, 2025
- No Work, filed Jul 3, 2025
- Alteration, filed Jun 5, 2025, estimated cost $166K, described as “Interior renovation to partitions, ceilings and doors as shown on plans. No change in use egress or occupancy.”
- Alteration, filed Mar 28, 2025, estimated cost $11K, described as “Addition of new check valve and butterfly valve within Stair D. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2025, estimated cost $600K, described as “Interior fit-out of multi-tenant corridor on 45C/46M. No change in use, egress or occupancy.”
- Alteration, filed Mar 4, 2025, estimated cost $656K, described as “Interior construction of existing B (office) occupancy on 5C/6M floor including install. of new non-load bearing partitions. ceilings and light fixtures. No change in use, egress or occupancy.”
- Alteration, filed Feb 21, 2025, estimated cost $3K, described as “Installation of a temporary work platform as per plans during general construction work. No change in use, egress or occupancy. Work platform installed in accordance with 2022 NYC building code, chapter 33”
- Alteration, filed Dec 4, 2024, estimated cost $1K, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $528, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $660, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 4, 2024, estimated cost $660, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”

117 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1007297505/2-manhattan-west.

## Property taxes

- Assessment: $370,447,920
- 2026–27 tax: $560,974
- Market value (city estimate): $823,217,600
- Taxable value: $5,171,220
- Assessed land: $44,329,050
- Assessed improvements: $326,118,870
- Condo units with their own tax lots: 2

## Tax breaks

- IDA PILOT, with no end date.

## Zoning

C6-4: floor area ratio 29.48 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NAVD88).

## Board and land use applications

- Manhattan West Phase 4 Final Completion Chair Cert (City Planning 2022M0406): Certification, Completed, filed Nov 14, 2022, decided Oct 31, 2023. This is an application for two Chair Certifications to approve the final completion of Phase IV of the Manhattan West/Ninth Ave Rail Yard PAA (eastern portion of Central Plaza & Art Plaza) and the substantial completion of a portion of the…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology