# 351 West 14th Street, Manhattan

Condominium · built c. 1885 · Block 738, Lot 7505.

On Umarelli: https://umarelli.org/nyc/1007387505/351-west-14-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

## Building permits

- Alteration, filed Oct 19, 2026, estimated cost $380K, described as “Interior fit-out of 2ND floor office (group b). Install non-bearing partitions, ceilings, doors and finishes per plans. No change to use, egress or occupancy.”
- No Work, filed Oct 14, 2026, described as “Eating & Drinking Establishment Launch Parties / Previews”
- Alteration, filed Sep 30, 2026, estimated cost $3.2M, described as “Installation of partitions as shown on plans submitted herewith. Work to include removals of existing partitions and fit-out for new tenant”
- No Work, filed Sep 14, 2026
- Alteration, filed Mar 28, 2026, estimated cost $2.2M, described as “Interior renovation of select partitions, ceilings and doors for fit-out of 7th floor office space. No change in use, egress or occupancy.”
- Alteration, filed Aug 26, 2025, estimated cost $500K, described as “General construction work as shown on plans.”
- Alteration, filed Apr 21, 2025, estimated cost $1.2M, described as “Interior renovation of existing cellar and first floor commercial tenant space. No change in use, egress or occupancy.”
- No Work, filed Nov 4, 2024, described as “Temporary event " Alice + Olivia x Beatles Launch"”
- No Work, filed Sep 5, 2024, described as “Fashion show and reception with beverage, for Phillip Lim.”
- Alteration, filed Sep 4, 2024, estimated cost $8K, described as “Temporary structures for a fashion show. Removed at the end of the programing. No changes to existing structures, use or egress”
- Alteration, filed Apr 11, 2024, estimated cost $30K, described as “Plumbing work as shown on plans (Prebuild Phase - Floors 5 & 6).”
- Alteration, filed Feb 6, 2024, estimated cost $1.9M, described as “General construction work to include interior fitout for private office on 8th floor as shown on plans. Work to include exterior terrace fitout including installation of planters over existing pavers.”
- Alteration, filed Feb 22, 2023, estimated cost $12K, described as “Installation of temporary suspended scaffold as per drawings. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 7, 2023, estimated cost $16K, described as “Installation of temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 7, 2022, estimated cost $3K, described as “Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Dec 7, 2022, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 20, 2022, estimated cost $10K, described as “Installation of personnel/material hoist for worker access during construction. P/m hoist shall comply with nycc 2014 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed May 26, 2022, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans. All equipment shall comply with chapter # 33 of the 2014 code, no changess in use in egress or occupancy under this application.”
- Alteration, filed May 18, 2022, estimated cost $1K, described as “Installation and use of mini crane as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 4, 2022, estimated cost $1K, described as “Structural and partial demolition work as shown on plans (DMO Phase 3).”
- Alteration, filed Feb 4, 2022, estimated cost $1K, described as “Structural work and partial demolition as shown on plans (DMO Phase 3).”
- Alteration, filed Jan 5, 2022, estimated cost $100K, described as “Installation of temporary shoring as shown on plans submitted herewith.”
- Alteration, filed Jan 5, 2022, estimated cost $100K, described as “Installation of temporary shoring as shown on plans submitted herewith.”
- Alteration, filed Jan 3, 2022, estimated cost $15K, described as “Structural removal and temporary shoring as shown on plans submitted herewith. (Phase 2)”
- Alteration, filed Dec 20, 2021, estimated cost $10K, described as “Removal of cellar wall and associated means and methods as shown on plans, in conjunction with Alt 1 # 121206649 and Alt 1 # 121206667.”

24 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1007387505/351-west-14-street.

## Property taxes

- Assessment: $16,361,099
- 2026–27 tax: $1,659,860
- Market value (city estimate): $36,358,000
- Taxable value: $15,301,072
- Assessed land: $772,199
- Assessed improvements: $15,588,900
- Condo units with their own tax lots: 4

## Zoning

C6-2A (part of the lot is R8B): floor area ratio 3.86 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Gansevoort Market Historic District (Historic District). 12 Landmarks Preservation Commission permits are on file.

## In the news

[50 Ninth Avenue Completes Construction in Chelsea, Manhattan](https://newyorkyimby.com/2024/06/50-ninth-avenue-completes-construction-in-chelsea-manhattan.html), New York YIMBY, Jun 7, 2024.