111 8th Avenue, Manhattan
Commercial · built c. 1931 · Block 739, Lot 1.
Building permits
- Alteration, filed Aug 21, 2026, estimated cost $5K, described as “Installation of a temporary scaffold in the shaft as per plans. No change in use, egress or occupancy. Scaffold shall comply with chapter 33 of 2022 NYC building code.”
- Alteration, filed Aug 17, 2026, described as “Industrial rope access for facade inspections”
- Alteration, filed Aug 11, 2026, estimated cost $360K, described as “Filing for removal of (3) ac units and installation of (3) fcus and associated ducts and piping as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 17, 2026, estimated cost $1.8M, described as “Construction of new partitions, ceilings, doors, equipment, finishes, etc. No change in use, egress, or occupancy.”
- Alteration, filed Jun 17, 2026, estimated cost $62K, described as “Relocation of existing branch piping and sprinkler heads for new layout.”
- Alteration, filed Jun 17, 2026, estimated cost $120K, described as “Construction work as shown on plans filed herewith. No change to use or occupancy.”
- Alteration, filed Jun 15, 2026, estimated cost $1.2M, described as “Tenant alterations to commercial interior. No alterations to existing base building envelope, HVAC/mechanical or lighting system. Addition of multiple poer (security vestibules) to 7TH floor of 111 8TH ave building. No change in use,…”
- Alteration, filed Jun 9, 2026, estimated cost $1.9M, described as “Filing for removal and installation exterior furniture and finishes on 8th Floor terrace. No change in use, egress, or occupancy in this application.”
- No Work, filed May 29, 2026, described as “A3 pop up concert taking place after business hours in a ground floor retail space. Performance stage is less than 120 SF.”
- Alteration, filed May 8, 2026, estimated cost $270K, described as “Reinforcement of framing and furniture attachments on 8th Floor Roof Terrace as per plans. No change in use, egress, or occupancy in this application.”
- Alteration, filed Apr 29, 2026, estimated cost $156K, described as “Demolition of existing tenant spaces, including the removal of existing partitions, ceilings, doors, equipment, finishes, etc. No change to use, egress, or occupancy.”
- Alteration, filed Mar 28, 2026, estimated cost $790K, described as “Modifications to existing mechanical systems and associated ducts and piping as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 28, 2026, estimated cost $4.4M, described as “Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $100K, described as “Interior demolition of non-bearing walls, ceilings, floors, and doors to prepare the space for new construction. No change in use, egress, or occupancy.”
- Alteration, filed Mar 26, 2026, estimated cost $3.4M, described as “Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $225K, described as “Filing for removal of existing raised floor, doors, non-bearing partitons, and finishes as part of renovation of existing sprinklered commercial kitchen and workplace cafeteria space. No change in use, egress, or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $4.0M, described as “Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2026, estimated cost $715K, described as “Four (4) CRAC units are being replaced and one (1) new CRAC unit is being installed on the 8th floor with associated ductwork and piping modifications. One (1) new Ceiling-hung A/C unit is being installed in the roof penthouse with…”
- Alteration, filed Mar 6, 2026, estimated cost $120K, described as “New electrical routing for future kitchen areas. New piping connections to be made on upper floors within the building, under seperate application. There is no change in use, egress or occupancy as part of this application.”
- Alteration, filed Mar 6, 2026, estimated cost $450K, described as “New low temperature hot water scope for future areas. New piping connections to be made on upper floors within the building, under seperate application. There is no change in use, egress or occupancy as part of this application.”
- Alteration, filed Mar 6, 2026, estimated cost $204K, described as “Filing for installation of sprinkler heads and related piping as per plans. Filing for installation of water/sanitary plumbing fixtures and related piping as per plans. No change in use, egress, or occupancy in this application.”
- Alteration, filed Mar 5, 2026, estimated cost $86K, described as “Filing for interior structural modifications to framing between Cellar and 1st Floor for MEP support. New concrete pads for MEP equipment in Cellar. No change in use, egress, or occupancy in this application.”
- Alteration, filed Mar 5, 2026, estimated cost $4.4M, described as “Filing for installation of HVAC units in Cellar and associated ducts and piping throughout Cellar to Floor 8 for future fit-out connections as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 12, 2026, estimated cost $33K, described as “Interior renovation. Mechanical modifications related to ductwork on part of the 3rd floor”
- Alteration, filed Jan 16, 2026, estimated cost $49K, described as “Demolition of existing plumbing piping and fixtures within the area of work and the floor below. Demolition of sprinkler main, branch piping, and heads within the area of work. Demolition of standpipe branches feeding pre-action system.”
153 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $565,000,000
- 2026–27 tax
- $57,569,965
- Market value (city estimate)
- $1,255,555,600
- Taxable value
- $530,696,578
- Assessed land
- $49,500,000
- Assessed improvements
- $515,500,000
Zoning
M1-5: floor area ratio 13.09 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 1, 2024: $405,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 111 8TH AVE (City Planning P2008M0073): Completed, decided Sep 30, 2009. 07DCP085M: SPECIAL PERMIT TO INCRASE THE PERMITTED CAPACITY OF THE GARA GE FROM 342 SPACES TO 691 SPACES
- ST VINCENT'S COMPREH. CANCER CENTER (City Planning P1997M0338): Completed, decided Aug 28, 1997. 97DCP024M: SPECIAL PERMIT TO ALLOW THE CONSTRUCTION AND OPERATION OF AP PROX. 53,000 SQ. FT. OF HOSPITAL RELATED USE IN THE EXISTING MANUFACTURING ZONING DISTRICT
- FISA & DOITT OFFICES (City Planning P1995M0212): Completed, decided Mar 23, 1995. LEASE OF APPROX 165,000SF OF SPACE FOR THE CONTINUED OPERA-*TION OF THE FINANCIAL INFO SERVICES AGENCY & THE DEPT OF*INFO TECH & TELECOMMUNICATION OFFICES