350 West 31st Street, Manhattan
Commercial · built c. 1924 · Block 754, Lot 68.
Building permits
- Alteration, filed Oct 8, 2024, estimated cost $125K, described as “Replace oil tank.”
- Alteration, filed Aug 21, 2024, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 12, 2024, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy”
- Alteration, filed Jun 18, 2024, estimated cost $62K, described as “Application filed for facade repair (local law 11 of 1998 cycle #9) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Apr 19, 2024, described as “Installation of suspended scaffold during facade inspection/ repair.”
- No Work, filed Nov 9, 2023
- Alteration, filed Aug 29, 2023, estimated cost $103K, described as “Application filed for plumbing/sprinkler modifications/additions on the 1ST floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 29, 2022, estimated cost $44K, described as “Application filed for mechanical modifications/additions on the 1ST floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 20, 2022, estimated cost $11K, described as “Application filed for a change in use and occupancy on the 1ST floor. Work includes interior renovation of non-load bearing partitions, ceilings, and finishes for new ADA bathrooms as per plans filed herewith.”
- Alteration, filed Dec 20, 2022, estimated cost $30K, described as “Application filed for structural modifications on the 1ST floor as per plans filed herewith. (folding partition support) no change in use, egress, or occupancy.”
- Alteration, filed Oct 19, 2022, estimated cost $258K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 1ST floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Apr 21, 2022, estimated cost $25K, described as “Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in basement. Initial installation approved under application #121050959”
- Alteration, filed Jan 13, 2022, estimated cost $245K, described as “Construction changes on the 4th floor (UAW) as indicated on drawings.”
- Alteration, filed Jan 11, 2022, estimated cost $9K, described as “Sprinkler work on the 4th floor (UAW) as indicated on drawings.”
- Alteration, filed Jan 11, 2022, estimated cost $25K, described as “Plumbing work on the 4th floor (UAW) as indicated on drawings.”
- Alteration, filed Jan 11, 2022, estimated cost $24K, described as “Mechanical work on the 4th floor (UAW) as indicated on drawings.”
- Alteration, filed Nov 9, 2021, estimated cost $13K, described as “Application filed for plumbing/sprinkler modifications/additions on the 4TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 9, 2021, estimated cost $10K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 4TH floor (new ADA bathroom) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 8, 2021, estimated cost $5K, described as “Application filed for modifications/additions to mechanical on the 4TH floor (new ADA bathroom) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 5, 2021, estimated cost $46K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 1ST floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 21, 2021, estimated cost $11K, described as “Tenant structural work on roof framing (ceiling of 8th floor) as indicated on drawings. No roof work to be done as part of this application.”
- Alteration, filed Apr 9, 2021, estimated cost $982K, described as “Tenant architectural work on 8th floor as indicated on drawings.”
- Alteration, filed Apr 8, 2021, estimated cost $45K, described as “Tenant sprinkler work on 8th floor as indicated on drawings.”
- Alteration, filed Apr 8, 2021, estimated cost $82K, described as “Tenant plumbing work on 8th floor as indicated on drawings.”
- Alteration, filed Apr 8, 2021, estimated cost $213K, described as “Tenant mechanical work on the 8th floor and roof as indicated on drawings.”
3 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Feb 23, 2004, permit issued - entire job/work, described as “Propose to convert existing offices/showrooms/factory to offices, and basement from factory to storage, boiler room, oil tank & building offices.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $3,681,900
- 2026–27 Tax
- $391,657
- Market value (city estimate)
- $8,182,000
- Taxable value
- $3,606,750
- Assessed land
- $711,000
- Assessed improvements
- $2,970,900
Zoning
C6-3X: floor area ratio 8.00 built, 9.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.