368 9th Avenue, Manhattan
Commercial · built c. 1931 · Block 754, Lot 78.
Building permits
- Alteration, filed Sep 9, 2026, estimated cost $3K, described as “Filing to correct notation under app. #M01039019-I1, which stated ansul system to be installed by others. No ansul system proposed or installed. Existing conditions to remain. No new work, change of use, occupancy, or egress under this…”
- Alteration, filed Aug 12, 2026, estimated cost $37K, described as “Filing herewith plumbing plans. Work to include plumbing work as shown on plans. There will be no change of use, occuancy or egress under this application.”
- Alteration, filed Jul 6, 2026, estimated cost $80K, described as “General construction work on 14TH floor to convert two existing office conference rooms into four private offices.”
- Alteration, filed Apr 8, 2026, estimated cost $63K, described as “Fling herewith drawings indicating mechanical work on 17th floor. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2026, estimated cost $707K, described as “Filing herewith the interior renovation of 17th floor as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2026, estimated cost $6K, described as “Filing herewith modification to an existing sprinkler system as per plans on 17th floor. No change to use, egress or occupancy.”
- Alteration, filed Mar 3, 2026, estimated cost $337K, described as “Filing herewith plumbing plans. Work to include plumbing work as shown on plans. There will be no change of use, occuancy or egress under this application.”
- Alteration, filed Mar 3, 2026, estimated cost $786K, described as “Filing herewith mechanical plans to indicate mechanical ductwork as shown on plans. There will be no change of use, occupancy or egress under this application.”
- Alteration, filed Mar 3, 2026, estimated cost $6.0M, described as “Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Mar 3, 2026, estimated cost $206K, described as “Filing herewith for the addition/modification to an existing sprinkler system as shown on plans. There will be no change of use, occupancy or egress under this application.”
- Alteration, filed Aug 21, 2025, estimated cost $1K, described as “Temporary cantilevered platform as per drawings. Cantilevered platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 21, 2025, estimated cost $1K, described as “Temporary roof protection as per drawings. Roof protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 21, 2025, estimated cost $3K, described as “Temporary system scaffold as per drawings. System scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 12, 2025, estimated cost $43K, described as “Filing herewith plumbing work on the 15th Fl. (14th FL Construction, 15th FL. Marketing) as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2025, estimated cost $106K, described as “Filing herewith mechanical work on the 15th FL. (14th Construction FL., 15th Marketing FL.) as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 11, 2025, estimated cost $37K, described as “Filing herewith modification to an existing sprinkler system as per plans filed herewith (14th FL. Construction, 15th FL. Marketing). No change to use, egress or occupancy.”
- Alteration, filed Jun 4, 2025, estimated cost $1.5M, described as “Filing herewith the interior demo. and interior renovation on the 15th FL. (14th Construction, 15th Marketing) as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 29, 2025, estimated cost $45K, described as “Converting 15th floor setback (420sf 60 x 7) into a terrace as shown on plans. There will be no change of use, occupancy or egress under this application.. In compliance with roof top bulletin 2018-002”
- Alteration, filed Apr 1, 2025, estimated cost $1.6M, described as “Mechanical work on the 4th floor as indicated on drawings: minor related work on the 2nd and 3rd floors.”
- Alteration, filed Apr 1, 2025, estimated cost $180K, described as “Sprinkler and standpipe work on the 4th floor as indicated on drawings.”
- Alteration, filed Apr 1, 2025, estimated cost $2.0M, described as “Plumbing work on the 4th floor as indicated on drawings.”
- Alteration, filed Mar 31, 2025, estimated cost $6.0M, described as “Architectural work on the 4th floor as indicated on drawings.”
- Alteration, filed Mar 28, 2025, estimated cost $100K, described as “Structural work on 4th floor as indicated on drawings includes slab penetrations, concrete equipment pads, and a new exterior equipment dunnage platform.”
- Alteration, filed Mar 3, 2025, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Feb 5, 2025, estimated cost $1K, described as “Installation of non-advertising, non-flashing and illuminated business accessory sign on front facade of existing store at 1ST floor level.”
59 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $48,940,200
- 2026–27 tax
- $4,305,016
- Market value (city estimate)
- $108,756,000
- Taxable value
- $48,940,200
- Assessed land
- $5,895,000
- Assessed improvements
- $43,045,200
Tax breaks
- ICAP abatement, through Jun 30, 2030, a $1,004,017 credit this tax year.
Zoning
C6-3X: floor area ratio 15.60 built, above the 9.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.