545 8th Avenue, Manhattan
Commercial · built c. 1927 · Block 761, Lot 33.
Building permits
- Alteration, filed Sep 28, 2026, estimated cost $140K, described as “At 24TH floor, installation of 2-hour rated partitions,interior non bearing partitions, and doors as per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Oct 28, 2025, estimated cost $280K, described as “At 18TH floor tenant space #1810, installation of interior non bearing partitions and doors as per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Apr 3, 2025, estimated cost $124K, described as “Remove 3000 gallon fuel oil tank.”
- Alteration, filed Mar 18, 2025, estimated cost $190K, described as “At 11TH floor tenant space, modifications to existing mechanical system as per plans filed herewith. No change to occupancy or means of egress.”
- Alteration, filed Mar 18, 2025, estimated cost $10K, described as “At 11TH floor tenant space, modifications to existing sprinkler system as per plans filed herewith. No change to occupancy or means of egress.”
- Alteration, filed Mar 18, 2025, estimated cost $40K, described as “At 11TH floor tenant space, modifications to existing plumbing system as per plans filed herewith. No change to occupancy or means of egress.”
- Alteration, filed Feb 24, 2025, estimated cost $250K, described as “At 11TH floor tenant space, installation of interior non bearing partitions as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 9, 2024, estimated cost $31K, described as “At 11TH floor tenant space, removal of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
- Alteration, filed Aug 22, 2024, described as “Outrigger Suspended Scaffold for exterior works and inspections”
- Alteration, filed May 23, 2024, estimated cost $30K, described as “At tenant suite #1450, removal and installation of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
- Alteration, filed Sep 29, 2023, estimated cost $6K, described as “Erect illuminated accessory business led channel letter wall sign with back lit aluminum panel, no change to use, egress or occupation”
- Alteration, filed Aug 28, 2023, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with facade repairs. No change in use, egress or occupancy. Sidewalk shed installed in accordance with 2022 NYC building code, chapter 33”
- Alteration, filed Jul 21, 2023, estimated cost $1.2M, described as “Repairs at east facade and low roof setbacks at 18TH floorthrough roof level. As per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Apr 11, 2023, estimated cost $15K, described as “At 20TH floor tenant space, removal and installation of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
- Alteration, filed Oct 4, 2022, estimated cost $60K, described as “At 23RD floor suite 2315 & suite 2325, removal and installation of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
- Alteration, filed Aug 3, 2022, estimated cost $15K, described as “At cellar, modifications to existing plumbing system as per plans filed herewith. No change in use, occupancy or means of egress”
- Alteration, filed Aug 1, 2022, estimated cost $30K, described as “At 22ND floor hallway and suite 2250, removal and installation of interior non bearing partitions and doors as per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Jun 7, 2022, estimated cost $257K, described as “Exterior Rear Facade and Balcony Repair”
- Alteration, filed Apr 21, 2022, estimated cost $30K, described as “It is proposed to renovate existing 1st floor & mezzanine store for a new "subway" sandwich store. Install plumbing fixtures in junction with DOB now application#: M00628110. No change in use, egress or occupancy.”
- Alteration, filed Apr 21, 2022, estimated cost $223K, described as “It is proposed to renovate existing 1st floor & mezzanine store for a new "subway" sandwich store. Install interior non load-bearing partitions, finishes, hung ceiling, HVAC duct work & replace existing storefront. No change in use, egress…”
- Alteration, filed Apr 21, 2022, estimated cost $3K, described as “Install 12'-0" high temporary construction fence @ 3'-0" from building line in conjunction with job#: M00628110. No change in use, egress or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $10K, described as “At 9TH floor suite 910 bathroom, modifications to existing plumbing system and relocation of plumbing fixtures and piping as per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Mar 28, 2022, estimated cost $10K, described as “At 22ND floor, removal and installation of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $10K, described as “At 22ND floor, modifications to existing plumbing system and relocation of plumbing fixtures and piping as per plans filed herewith. No change in use, occupancy or means of egress.”
- Alteration, filed Mar 28, 2022, estimated cost $80K, described as “At tenant suite #1015, removal and installation of interior non bearing partitions and doors, no change to use, egress, or occupancy.”
12 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $11,378,700
- 2026–27 tax
- $1,234,361
- Market value (city estimate)
- $25,286,000
- Taxable value
- $11,378,700
- Assessed land
- $1,714,500
- Assessed improvements
- $9,664,200
Zoning
M1-9A/R12: floor area ratio 22.55 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning map change, Zoning text change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Garment Center Text Amendment (City Planning 2018M0412): Completed, decided Dec 26, 2018. The NYC Department of City Planning proposes a zoning text amendment to the Special Garment Center District to better reflect the current land use and promote a healthy mix of uses. In addition to changes regarding use regulations within…