# 321 West 38th Street, Manhattan

New or merged lot · Block 762, Lot 23.

The city hasn’t published tax or zoning records for this lot yet; new and merged lots usually appear within a few months.

On Umarelli: https://umarelli.org/nyc/1007620023/321-west-38-street

Every lot on block 762: https://umarelli.org/nyc/manhattan/762.md

## Building permits

- Alteration, filed Feb 11, 2026, estimated cost $2K, described as “Illuminated non-advertising accessory sign on marquee permitted under job no: 141027083 - hotel 38. No change of use, egress or occupancy.”
- Alteration, filed Jul 28, 2025, estimated cost $10K, described as “Hereby filing for installation of new gas fired boiler serving residential units on floor 2 thru 4TH. This application is filed in conjunction with alteration type 1 #121206729”
- Alteration, filed Aug 20, 2024, described as “Installation of 2 point suspended scaffolding during construction in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Mar 21, 2024, estimated cost $100K, described as “Hereby filing for mechanical work related to emergency generator. This application is filed in conjunction with alteration type 1 #121206729.”
- Alteration, filed Mar 14, 2024, estimated cost $100K, described as “Hereby filing for fuel storage work for emergency generator. This application is filed in conjunction with alteration type 1 # 121206729”
- Alteration, filed Feb 16, 2024, estimated cost $1K, described as “Installation of sidewalk shed and construction fence in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Feb 16, 2024, estimated cost $1K, described as “Installation of personnel/material hoist in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Sep 29, 2023, estimated cost $2K, described as “Hereby filing for construction fence inconjuction with ALT1 application #121206729”
- Alteration, filed Aug 28, 2023, estimated cost $10K, described as “Hereby filing for new temporary standpipe alarm system as per local law 63&64 of 2009. This application is filed in conjunction with ALT1 application# 121206729”
- Alteration, filed Mar 21, 2023, estimated cost $100K, described as “Hereby filing for related support of excavation in conjunction with alt 1 # 121206729”
- Alteration, filed Jan 30, 2023, estimated cost $10K, described as “Foundation work for the new 26 story building”
- Alteration, filed Dec 14, 2022, estimated cost $746K, described as “Hereby filing for new sprinkler & standpipe system inconjunction with alteration type 1 # 121206729”
- Alteration, filed Oct 24, 2022, estimated cost $2.0M, described as “Hereby filing for structural related work for ALT1 application# 121206729.”
- Alteration, filed Oct 14, 2022, estimated cost $400K, described as “Hereby filing for partial demo work related to alt 1 #121206729 filing. Removal of existing 4 story brick building with cellar. Portions of existing wall and entire front facade to remain.”
- Alteration, filed Jun 21, 2022, estimated cost $1K, described as “Hereby filing mechanical work for installation of air conditioning unit. Filed in conjunction with alt 1 #121206729”
- Alteration, filed Nov 18, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 2, 2021, estimated cost $3K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 5, 2021, estimated cost $20K, described as “Installation of temporary shoring in cellar, 1st-4th floor per plan submitted. Work shall comply with 2014 Building Codes. No change in use, egress and/or occupancy with this filing.”
- Alteration, filed Mar 31, 2020, estimated cost $244K, described as “Hereby filing for new Plumbing work filed in conjunction with ALT-1 #121206729”

## In the news

[321 West 38th Street Nears Completion in Midtown, Manhattan](https://newyorkyimby.com/2025/06/321-west-38th-street-nears-completion-in-midtown-manhattan.html), New York YIMBY, Jun 14, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
