210 West 18th Street, Manhattan
Condominium · 47 units · built c. 1929 · Block 767, Lot 7505.
Building permits
- Alteration, filed May 14, 2026, estimated cost $10K, described as “Proposed interior renovation of apartment 9C on the 009 floor. No change in use, occupancy, or egress.”
- Alteration, filed Apr 10, 2026, described as “Industrial rope access for facade inspections.”
- Alteration, filed Jun 6, 2025, estimated cost $235K, described as “Interior alteration of apartment 19C on the 018 floor. No change in use, occupancy, or egress.”
- Alteration, filed Nov 12, 2024, estimated cost $300K, described as “Remove existing pressure reducing valves (PRV) in the MER room and all associated Pneumatic piping, Replace with new electronic PRV's, Replace existing inside service motorized valve and associated automatic shut off Panel. Provide New…”
- Alteration, filed Sep 30, 2024, estimated cost $50K, described as “Minor changes in partitions and new millwork in existing Apartment 12A. Plumbing work to be filed separately. No change in use, occupancy or egress.”
- Alteration, filed Sep 23, 2024, estimated cost $200K, described as “Renovate Apt. 17B/C on the 16th floor, work to include general construction, all work is interior. No change to use, egress or occupancy.”
- Alteration, filed Apr 14, 2024, estimated cost $501K, described as “Filing for the modification to the existing heat exchanger system, work to include replacing existing manual valves with automatic control valves.”
- Alteration, filed Mar 4, 2024, estimated cost $680K, described as “Minor alterations to building interior and wall & Floor protection in support of new mechanical equipment. No change to use, egress, or occupancy.”
- Alteration, filed Jan 11, 2024, estimated cost $10K, described as “Interior renovation of office space on the 1ST floor as per plans filed herewith”
- Alteration, filed Dec 20, 2023, estimated cost $550K, described as “Mechanical work to furnish and install new air handling unit on existing chiller system to serve the 7TH floor switchroom to comply with verizon standards to achieve redundancy”
- Alteration, filed Dec 15, 2023, estimated cost $320K, described as “Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments”
- Alteration, filed Oct 18, 2023, estimated cost $21K, described as “Interior renovation of existing penthouse # 7 on 19th and 20th floors including the removal of existing partitions and installation of new partitions as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Aug 5, 2022, estimated cost $20K, described as “Sidewalk shed for protection of public in conjunction with job # M00746573-I1. No change in use, egress, or occupancy.”
- Alteration, filed Jul 6, 2022, estimated cost $89K, described as “Hereby filing facade restoration as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Feb 11, 2022, estimated cost $397K, described as “Repairs of transformer room walls and air intake area way.”
- Alteration, filed Feb 3, 2022, estimated cost $300K, described as “Repairs & replacement of structural steel framing below air intake areaway in 17TH street sidewalk.”
- Alteration, filed Nov 23, 2021, estimated cost $320K, described as “Interior renovation of an existing duplex apartment#1516B on the 15th and 16th floors. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 24, 2021, estimated cost $1.3M, described as “Chiller Replacement”
- Alteration, filed Mar 24, 2021, estimated cost $1.1M, described as “Structural work for chiller replacement”
- Alteration, filed Mar 11, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Feb 16, 2021, estimated cost $10K, described as “Filing for Plywood Construction Fence from face of building to curb for a total of 14'4" width and 16' length. Related to Verizon Chiller Replacement project.”
- Alteration, filed Aug 3, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Feb 14, 2020, estimated cost $25K, described as “Respectfully request to submit revised fuel storage plans”
- Alteration, filed Oct 24, 2019, estimated cost $1K, described as “Installation of temporary 74' high pipe scaffold originating (off shed) for remedial repair work as per plan. No change in use egress or occupancy, pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Oct 24, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $36,780,301
- 2026–27 Tax
- $4,025,177
- Market value (city estimate)
- $81,734,000
- Taxable value
- $34,056,280
- Assessed land
- $2,136,141
- Assessed improvements
- $34,644,160
- Condo units with their own tax lots
- 55
Zoning
C6-2A: floor area ratio 11.58 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 7, 2026: $9,000,000, Apt 9A/B
- Feb 6, 2026: $4,550,000, Apt 9C
- Dec 19, 2024: $7,750,000, Apt 19C
- Sep 17, 2024: $14,500,000, Apt PH8
- May 20, 2024: $13,350,000, Apt 11C/D
- May 16, 2024: $7,950,000, Apt 17A
- Apr 18, 2023: $11,608,000, Apt PH7
- Dec 2, 2022: $9,150,000, Apt 16D
- Jun 24, 2022: $14,162,000, Apt 17B/C
- Dec 1, 2021: $23,500,000, Apt 18A
The 10 most recent of 23 open-market sales since 2016, from the Department of Finance’s sales files.