250 West 19th Street, Manhattan
Apartment Building · 200 units · built 1986 · Block 768, Lot 59.
Building permits
- Alteration, filed Apr 12, 2026, estimated cost $180K, described as “Interior renovation of apt 15L & 15K on the 15th floor. Scope of work as shown in plans. No change in egress, occupancy or use.”
- Alteration, filed Jan 14, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 14, 2024, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Oct 23, 2024, estimated cost $350K, described as “LL11 Facade Related Repairs. No change in use, egress or occupancy.”
- Alteration, filed Aug 4, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with the CHAPTER#33 of the NYC code 2022, no changes in use or egress under this application.”
- Alteration, filed Apr 16, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Oct 27, 2022, estimated cost $130K, described as “Installation of mechanical equipment and related ductwork for apartment renovations as shown on drawings filed herewith.”
- Alteration, filed Jun 8, 2022, estimated cost $39K, described as “General construction for interior renovation of Apartment 9O as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 16, 2021, estimated cost $350K, described as “General construction for interior renovation of existing apartments as shown on drawings filed herewith. Plumbing filed separately under M00632485-I1. No change in use, egress or occupancy.”
- Alteration, filed Dec 15, 2021, estimated cost $50K, described as “Filing for plumbing modifications of interior apartment renovations as shown on drawings filed herewith. OT filed separately under M00631966-I1. No change in use, egress or occupancy.”
- Alteration, filed Nov 17, 2020, estimated cost $5K, described as “Plumbing modifications for interior renovation of Apartment 10N as shown on drawings filed herewith. OT filed separately under DOB #140978716. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2020, estimated cost $7K, described as “Plumbing modifications for interior renovation of Apartment 10D as shown on drawings filed herewith. OT filed separately under DOB #140935479. No change in use, egress or occupancy.”
- Alteration, filed May 1, 2020, estimated cost $6K, described as “Replace gas/oil burner on existing gas service.”
- Alteration, filed Jan 16, 2020, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during facade restoration. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Nov 5, 2018, estimated cost $7K, described as “Installation of pipe scaffold as per plans . Scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Mar 19, 2018, estimated cost $5K, described as “Installation of heavy duty sidewalk shed as per plans. Live load 300 psf. Sidewalk shed shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
Building history
- Alteration, filed May 17, 2017, permit issued - entire job/work, described as “Renovation of existing unit 16B located on the 015 floor to add residential lounge area, change to the certificate of occupancy. Change to the certificate of occupancy to add laundry use to the cellar to address ecb violation 35007246J.”
- Major Renovation — Conversion, filed Oct 18, 1994, signed off Oct 4, 1996, 200 units added, 16 stories, described as “Erect penthouse and greenhouse at roof.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $27,877,500
- 2026–27 Tax
- $3,139,117
- Market value (city estimate)
- $61,950,000
- Taxable value
- $25,236,089
- Assessed land
- $2,632,500
- Assessed improvements
- $25,245,000
Zoning
C6-2A: floor area ratio 6.63 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- 250 W19TH ST (City Planning P1986M0249): Completed, decided Sep 26, 1986. SPEC PERM FOR A 60 SPACE PUBLIC PARKING GARAGE & 12 SPACES*ARE FOR TRANSIENT USE
- 250 W19TH ST (City Planning P1984M0336): Completed, decided Oct 4, 1984. SPEC PERMIT (ZR74-52) TO INCLUDE A 3-LEVEL BELOW GRADE*PKINGGARAGE W/195 SPACES IN AN 11 STORY RESDL BLDG