# 200 West 26th Street, Manhattan

Apartment building · 231 units · built 2000 · Block 775, Lot 44.

On Umarelli: https://umarelli.org/nyc/1007750044/200-west-26-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

## Building permits

- Alteration, filed Jun 30, 2026, estimated cost $150K, described as “Removal of non-structural partitions, fixtures, finishes, & appliances and the construction of new non-structural partitions, & installation of new fixtures, finishes and appliances as indicated on drawings. No change in use, egress, or…”
- Alteration, filed Jun 16, 2026, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Jun 9, 2026, estimated cost $50K, described as “Modifications of existing storefront. No change to use, occupancy or egress”
- Alteration, filed May 13, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 31, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Mar 30, 2026, estimated cost $53K, described as “Exterior repairs”
- Alteration, filed Feb 26, 2026, estimated cost $2K, described as “Install exterior illuminated wall sign (the malin)”
- Alteration, filed Nov 24, 2025, estimated cost $630K, described as “Change of use on 1ST floor from retail to offices (use group 6). No change in egress. Changes to use and occupant load. Obtain a new c of o”
- Alteration, filed Oct 1, 2025, estimated cost $715K, described as “Interior renovation on first floor as indicated on plans filed herewith. No change in use egress or occupancy under this application”
- Alteration, filed Jan 28, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Jul 30, 2024, estimated cost $458K, described as “Interior renovation of commercial existing retail banking branch. Work includes but is not limited to demolition and construction of non-structural partitions, ceiling, finsihes and furniture/equipement.”
- Alteration, filed Feb 28, 2024, estimated cost $80K, described as “Interior alterations to existing commercial space. No change to use, occupancy or egress”
- Alteration, filed Jan 8, 2024, estimated cost $5K, described as “Proposal to install an illuminated, non-flashing, accessory business sign for commercial tenant chip city. No change in use, egress or occupancy under this application. Wording: \*logo\* "chip city" \*logo\*.”
- Alteration, filed Nov 15, 2023, estimated cost $100K, described as “Hereby filing for the renovation of existing commercial space. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2023, estimated cost $21K, described as “In-kind replacement HVAC split system (7.5 ton) on the roof for the elevator machine room.”
- Alteration, filed May 16, 2023, estimated cost $42K, described as “Lighting upgrades for bank of america at this location. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 24, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 18, 2021, estimated cost $63K, described as “Construction of new interior non-bearing partitions. Modifications to existing storefront. No change in egress use or occupancy.”
- Alteration, filed May 10, 2021, estimated cost $280K, described as “Hereby filing facade restoration as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 24, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Property taxes

- Assessment: $36,787,500
- 2026–27 tax: $4,367,778
- Market value (city estimate): $81,750,000
- Taxable value: $35,113,580
- Assessed land: $2,515,500
- Assessed improvements: $34,272,000

## Zoning

C6-3X (part of the lot is C6-2A): floor area ratio 20.32 built, above the 9.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 270 7TH AVE (City Planning P1986M0661): Completed, decided Sep 12, 1990. 86-230M: MIXED USE 17 STORY BUILDING WITH PARKING.

## In the news

[TF Cornerstone Secures Retail Tenant for Chelsea Centro at 278 Seventh Avenue in Chelsea, Manhattan](https://newyorkyimby.com/2023/09/tf-cornerstone-secures-retail-tenant-for-chelsea-centro-at-278-seventh-avenue-in-chelsea-manhattan.html), New York YIMBY, Sep 1, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
