340 8th Avenue, Manhattan
College · built 1971 · Block 777, Lot 1.
Building permits
- No Work, filed Apr 29, 2026, described as “FIT: 2026 SGS Commencement & Reception”
- Alteration, filed Apr 27, 2026, estimated cost $230K, described as “B Bldg. AHU: Modification of HVAC equipment and ductwork to accommodate alterations for the new AHU's as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 30, 2025, estimated cost $3K, described as “Erect non-illuminated accessory business sign on wall for fashion institute of technology/state university of ny”
- Alteration, filed Oct 10, 2025, estimated cost $230K, described as “B Bldg. Econ: Modification of HVAC equipment and ductwork to accommodate alterations for the new economizer as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 10, 2025, estimated cost $54K, described as “Installation of a new prefabricated, manufactured guard booth.”
- Alteration, filed Jun 10, 2025, estimated cost $90K, described as “A Bldg. RTU: Modification of HVAC equipment and ductwork to accommodate the replacement of the rooftop RTU as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 22, 2025, estimated cost $20K, described as “Installation of work platform as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- No Work, filed May 5, 2025, described as “FIT 2025 SGS Commencement Reception”
- No Work, filed Apr 22, 2025, described as “2025 graduate brunch”
- Alteration, filed Apr 21, 2025, estimated cost $300K, described as “A&B Bldg. Lobby: Modification of interior partitions and finishes to accommodate alterations to the existing lobbies as indicated on plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Apr 11, 2025, described as “FIT: 2025 Future of Fashion Show & Gala”
- Alteration, filed Dec 18, 2024, estimated cost $100K, described as “B Bldg. 9fl: Modification of interior finishes and ceilings as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 31, 2024, estimated cost $300K, described as “Dubinsky Fac: Facade repairs for LL 11 as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 17, 2024, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. Sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 20, 2024, described as “Facade cleaning and repair”
- No Work, filed Apr 22, 2024, described as “FIT Graduate Brunch”
- No Work, filed Apr 19, 2024, described as “SGS Commencement Reception - indoor/outdoor event”
- Alteration, filed Jun 29, 2023, estimated cost $100K, described as “FIT A&B Showers: Plumbing modifications to accommodate alterations to the existing locker room and shower area as per plans.”
- No Work, filed May 8, 2023, described as “SGS Commencement & Hooding Reception”
- No Work, filed Apr 24, 2023, described as “Indoor/outdoor fashion show & gala at fit”
- Alteration, filed Nov 4, 2022, estimated cost $2.0M, described as “Fit wc ac: modification of HVAC equipment and ductwork at the existing fit a&b building as indicated on plans filed herewit.”
- Alteration, filed Jun 10, 2022, estimated cost $2K, described as “Proposed installation of debris chute as per plans. Chute shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 12, 2022, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- No Work, filed Apr 26, 2022, described as “Outdoor fashion show at fit”
- Alteration, filed Jun 24, 2021, estimated cost $1.0M, described as “Roof Replacement as per plans filed herewith. FIT West Courtyard. Scope of work involves no change to zoning, use, egress, occupancy.”
3 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $70,496,100
- Market value (city estimate)
- $156,658,000
- Taxable value
- $0
- Assessed land
- $11,225,700
- Assessed improvements
- $59,270,400
Zoning
C6-2 (part of the lot is C6-2A): floor area ratio 6.03 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.