242 West 30th Street, Manhattan
Commercial · built c. 1927 · Block 779, Lot 66.
Building permits
- Alteration, filed Sep 18, 2026, estimated cost $49K, described as “Replacment of split system on floor 007 setback and floor 008 with a total capacity of 14 tons. No change to egress, use, or occupancy.”
- Alteration, filed Sep 14, 2026, estimated cost $15K, described as “Application filed to installed new guard rail on existing building 7th floor set back as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 7, 2026, estimated cost $191K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 7TH floor (suite 704) as per plans filed herewith. No change in use,egress, or occupancy.”
- Alteration, filed Apr 21, 2026, estimated cost $153K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5TH floor (suite 500) as per plans filed herewith. No change in use,egress, or occupancy.”
- Alteration, filed Feb 12, 2026, estimated cost $242K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 8TH floor (suite 802-804) as per plans filed herewith. No change in use,egress, or occupancy.”
- Alteration, filed Apr 1, 2025, estimated cost $1K, described as “Installation of temporary pipe scaffold as per plan as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jan 10, 2024, estimated cost $256K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 4TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 19, 2023, estimated cost $48K, described as “Application filed for mechanical modifications/additions on the 2ND floor (njt) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 16, 2023, estimated cost $1K, described as “Installation of heavy duty netting as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Nov 23, 2022, estimated cost $1K, described as “Installation of temporary construction heavy duty netting as per plans. No change in use, occupancy or egress.”
- Alteration, filed Oct 18, 2022, estimated cost $103K, described as “Application filed for plumbing/sprinkler modifications/additions on the 2ND floor (njt) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 18, 2022, estimated cost $44K, described as “Application filed for mechanical modifications/additions on the 2ND floor (njt) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 3, 2022, estimated cost $223K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 2ND floor (njt) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 6, 2022, estimated cost $8K, described as “Application filed for mechanical modifications/additions to existing commercial lobby as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Sep 1, 2022, estimated cost $49K, described as “Application for interior/exterior renovation of existing commercial lobby on the first floor as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Jul 26, 2022, estimated cost $40K, described as “Work under this application is limited to the interior alterations to an existing office”
- Alteration, filed Jan 26, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jan 20, 2022, estimated cost $21K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 11TH floor (suite 1102) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 14, 2021, estimated cost $8K, described as “Application filed for plumbing additions/modifications on the 15TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 13, 2021, estimated cost $66K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 15TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 13, 2021, estimated cost $43K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 2ND floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 14, 2021, estimated cost $50K, described as “General construction in the 9TH floor as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jun 11, 2021, estimated cost $44K, described as “Sprinkler workon the 9TH floor as per plans filed herewith. Sprinkler work includes removal and relocating sprinkler heads. No change to use, egress, or occupancy.”
- Alteration, filed Jun 11, 2021, estimated cost $15K, described as “Plumbiing work on the 9TH floor as per plans filed herewith. No change to use,egress, or occupancy.”
- Alteration, filed Jun 11, 2021, estimated cost $15K, described as “Mechanicak work on the 9TH floor as per plans filed herewith. No change to use,egrese, or occupancy.”
4 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Jun 27, 2003, signed off Jan 18, 2017, described as “Propose to convert 2ND through 14TH floor to office use. No work to be done under this application.”
- Alteration, filed Nov 8, 2002, plan exam - disapproved, described as “Propose to convert 2ND thru 25TH floors to office use. No work to be done.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $7,254,900
- 2026–27 Tax
- $749,111
- Market value (city estimate)
- $16,122,000
- Taxable value
- $6,905,520
- Assessed land
- $580,500
- Assessed improvements
- $6,674,400
Zoning
M1-9A/R12: floor area ratio 12.82 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Furcraft Building (Individual Landmark). 6 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Furcraft Building (City Planning 2026M0173): Completed, filed Aug 22, 2025, decided Nov 25, 2025. The Landmarks Preservation Commission is requesting a report from the City Planning Commission on the landmark designation of the Furcraft Building, located at 242-246 West 30th Street, in the Midtown South neighborhood of Manhattan,…
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- 242 W30TH ST (City Planning P1983M1037): Completed, decided Jul 9, 1984. CERT-GRANDFATHERING DETERMINATION (ZR15-015), 3 UNITS
- 242-246 W30TH ST (City Planning P1984M0573): Completed, decided Mar 1, 1984. CHAIRMAN'S CERTIFICATION(ZR15-021)TO ALLOW CONVERSION OF 3*CH A BASEMENT,THROUGH THE 10TH 12TH AND FLOORS FOR*COMMERCIAL