# 252 West 30th Street, Manhattan

Condominium · 24 units · built c. 1927 · Block 779, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1007797501/252-west-30-street

More construction in Garment District: https://umarelli.org/nyc/manhattan/garment-district.md

Every lot on block 779: https://umarelli.org/nyc/manhattan/779.md

## Building permits

- Alteration, filed Apr 10, 2026, estimated cost $101K, described as “Installation of new AT&T site on the roof. Install 3 sectors (9 antennas) with associated parts, 9 RRH units, 1 GPS antenna and 1 equipment platform with cabinets. Related conduits on the facade and service connection in the basement.”
- Alteration, filed Sep 5, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 12, 2025, estimated cost $121K, described as “Railing installation as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 20, 2024, estimated cost $107K, described as “Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Aug 29, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Sep 26, 2023, estimated cost $15K, described as “Installation of two doors in window openings”
- Alteration, filed Dec 1, 2022, estimated cost $2K, described as “Structural, Foundation, and Earthwork filed in conjunction with 123922194”
- Alteration, filed Apr 25, 2022, estimated cost $15K, described as “Interioir renovation of apartment 2B. Renovation to include kitchen renovation and new bathroom as shown in plans.”
- Alteration, filed Apr 25, 2022, estimated cost $8K, described as “Plumbing application to install new fixtures as shown in plans.”
- Alteration, filed Sep 7, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 7, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 27, 2021, estimated cost $107K, described as “Interior renovation of unit 8A. Partitions, fixtures and finishes per plans. No change of use, egress, or occupancy this application.”
- Alteration, filed Apr 23, 2021, estimated cost $540K, described as “Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Dec 11, 2020, estimated cost $3K, described as “Modification to the gas service as per plans filed herewith. No change in use, egress and occupancy.”
- Alteration, filed Nov 3, 2020, estimated cost $25K, described as “Filing herewith modification of plumbing fixtures as indicated on the drawings. No change in use egress or occupancy.”
- Alteration, filed Nov 3, 2020, estimated cost $15K, described as “Filing herewith installation of HVAC system as indicated on the drawings.no change in use,egress or occupancy..”
- Alteration, filed Sep 3, 2020, estimated cost $19K, described as “Installing two new plumbing fixtures”
- Alteration, filed Mar 19, 2020, estimated cost $88K, described as “Remove and Replace sprinkler heads on first floor and mezzanine as per plans filed herewith. No change to occupancy use or egress under this application.”
- Alteration, filed Mar 19, 2020, estimated cost $34K, described as “Install 2 floor drains, 4 lavs, 5wc and 4 showers at first floor. No change to occupancy use or egress under this application.”
- Alteration, filed Jan 29, 2020, estimated cost $20K, described as “Replacing and adding plumbing fixtures. no change in use or occupancy.”
- Alteration, filed Jul 16, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $7,452,905
- 2026–27 tax: $728,518
- Market value (city estimate): $16,561,999
- Taxable value: $6,630,964
- Assessed land: $387,001
- Assessed improvements: $7,065,904
- Condo units with their own tax lots: 25

## Tax breaks

- Co-op and condo abatement, with no end date, a $85,682 credit this tax year.

## Zoning

M1-9A/R12: floor area ratio 9.55 built, 15.00 allowed by base zoning.

## Recent sales

- Nov 18, 2025: $1,825,000, Apt 12
- Mar 31, 2025: $1,725,000, Apt 5B
- Jan 30, 2024: $1,900,000, Apt 6B
- Feb 8, 2022: $1,325,000, Apt 11A
- Jul 29, 2021: $1,675,000, Apt 4B
- Apr 5, 2021: $1,660,000, Apt 8A
- Nov 20, 2019: $2,065,641, Apt 15
- Sep 5, 2019: $2,200,000, Apt 3B
- Jul 29, 2019: $2,050,000, Apt 6B
- May 22, 2019: $1,650,000, Apt 10A

The 10 most recent of 14 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning map change, Zoning text change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- 252 WEST 30TH STREET (City Planning P1984M1087): Completed. 84-056M: SPECIAL PERMIT FOR EXISTING BOXING GYM
- 252 W30TH ST (City Planning P1983M0754): Completed, decided Apr 29, 1983. CHAIRMAN CERT(ZR15-021)FOR LOFT CONVERSION

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
