225 West 34th Street, Manhattan
Commercial · built c. 1924 · Block 784, Lot 19.
Building permits
- Alteration, filed Oct 15, 2026, estimated cost $785K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 18TH floor (t&m security) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 28, 2026, estimated cost $320K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17TH floor (roux) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 21, 2026, estimated cost $145K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 21ST floor (m to-pros) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 3, 2026, estimated cost $248K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 20TH fl (calibre) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 31, 2026, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 21, 2026, estimated cost $102K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 13TH fl (jan brown law) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 15, 2026, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 29, 2026, estimated cost $195K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 16TH fl (hgf) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 21, 2026, estimated cost $96K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 19TH fl (scl law expansion) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Apr 3, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Mar 31, 2026, estimated cost $236K, described as “Facade repairs as indicated on drawings. There is no change to use, egress, or occupancy”
- Alteration, filed Mar 25, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 24, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 8, 2026, estimated cost $321K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 15TH floor (techno) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jan 12, 2026, estimated cost $185K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 14TH fl as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 26, 2025, estimated cost $408K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 21ST fl (infrastructure engineering) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 30, 2025, estimated cost $265K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 16TH floor (k-force) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 28, 2025, estimated cost $397K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 15TH fl (chelsea lighting) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 22, 2025, estimated cost $117K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 7TH floor (aib) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2024, estimated cost $1.0M, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 3RD fl (csg/emcor) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 21, 2024, estimated cost $50K, described as “Suite 400: Interior renovations for dental office office to include partitions and finishes along with mechanical ductwork as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Oct 1, 2024, estimated cost $573K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 7TH fl (e.e. Cruz) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 26, 2024, estimated cost $273K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 19TH fl (scl law) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 26, 2024, estimated cost $1.0M, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 9TH & 10TH fl (regus) as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 29, 2024, estimated cost $126K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 21ST fl (infrastructure engineering) as per plans filed herewith. No change in use, egress, or occupancy.”
30 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Aug 29, 2012, permit issued - entire job/work, described as “Various partition changes on part of the 1ST floor (west end) including removal of existing ductwork to change occupancy from restaurant, u.g. 12 to retail stores, u.g.6 with accessory storage on mezzanine (west end) (no work proposed on…”
- Alteration, filed May 8, 2001, permit issued - entire job/work, described as “Change of use from retail to office use on the 2nd floor. No work to be done under this application.”
- Alteration, filed Apr 27, 1995, permit issued - entire job/work, described as “No work performed under this appl. Change of use on 2ND fl. From offices to retail store (use group 10).”
- Alteration, filed Jul 23, 1992, permit issued - partial job, described as “Replace and relocate convenience stairs from 1ST to cel flrs. Replace & relocate convenience stair from 1ST to m ez. Renovate interior layout at east en d of 1ST & mez. Flrs., & entire cel flr. Install new handicap unisex…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $65,500,000
- 2026–27 Tax
- $7,112,645
- Market value (city estimate)
- $145,555,600
- Taxable value
- $65,500,000
- Assessed land
- $8,910,000
- Assessed improvements
- $56,590,000
Zoning
C6-4M (part of the lot is M1-9A/R12): floor area ratio 20.40 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Garment Center Text Amendment (City Planning 2018M0412): Completed, decided Dec 26, 2018. The NYC Department of City Planning proposes a zoning text amendment to the Special Garment Center District to better reflect the current land use and promote a healthy mix of uses. In addition to changes regarding use regulations within…