224 West 35th Street, Manhattan
Commercial · built c. 1924 · Block 784, Lot 60.
Building permits
- Alteration, filed Dec 3, 2025
- Alteration, filed Sep 18, 2025, estimated cost $15K, described as “Removal of fuel oil storage tank and associated piping .”
- Alteration, filed Sep 15, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 3, 2025, estimated cost $127K, described as “Interior built for a bagel shop as per the plans filed herewith. No change to the use, egress or occupancy.”
- Alteration, filed May 28, 2025, estimated cost $85K, described as “Show existing HVAC units at 2ND fl terrace, 3RD fl (#0300), 7TH fl (#710), 11TH fl (#1100), 12TH fl (#1200 & #1206), 15TH fl (#1500) , 16TH fl & roof. Obtain equipment use permit.”
- Alteration, filed Feb 26, 2025, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Feb 18, 2025, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. All work to comply with chapter 33 of nycc”
- Alteration, filed Dec 19, 2024, estimated cost $207K, described as “Facade repairs as per plans; no change to use, egress, or occupancy.”
- Alteration, filed Jan 17, 2024, estimated cost $16K, described as “Installation of new non-bearing gyp. bd. partitions, door, frame & finishes. No change in use, occupancy or egress.”
- Alteration, filed Jul 25, 2023
- Alteration, filed Apr 10, 2023, estimated cost $35K, described as “Remove illegal partition and restore occupancy from massage parlor to office as per existing CO#7910 @ 7TH floor unit 700. No change in use, means of egress or occupancy in this application.”
- Alteration, filed Mar 4, 2023, estimated cost $21K, described as “To resolve ecb violation #35661860X by legalizing illegal plumbing fixtures, and removing illegal pluming fixtures of existing commercial space at room #200 on 2ND floor in conjunction with general construction job #M00838006-I1 as per…”
- Alteration, filed Mar 4, 2023, estimated cost $50K, described as “To resolve ecb violation 35661860X by legalizing partitions and doors of existing office at ROOM#200 on 2ND floor with general construction work as per plan filed herewith.”
- Alteration, filed May 25, 2022, estimated cost $15K, described as “Modification and addition of sprinkler heads in public hallways as per plans in accordance with pipe schedule for light hazard”
- Alteration, filed Oct 28, 2021, estimated cost $25K, described as “Filing for the int. Renov exist. Comm area (u.g. 6)@1ST. Fl and mez fl.. Includes 1 new sink exis rough in. Cap & remove 1 sink,2 radiators,3 floor drains,1 mop sink & gas line for cook equip @1ST fl, cap & remove 1 three comp sink& 2 mop…”
- Alteration, filed Oct 27, 2021, estimated cost $296K, described as “We are filing for the interior renovation of an exist. Commercial area (u.g. 6)@1ST. Fl. And mezzanine fl. Includes replacing finishes throughout, replace lighting, new/remove partition walls.”
- Alteration, filed Jan 13, 2020, estimated cost $50K, described as “Modification of mechanical system at existing office space on 4TH floor. Work includes new a/c units and duct work as shown on plans. No change in use, egress, and occupancy under this application.”
- Alteration, filed Sep 27, 2018, estimated cost $500, described as “Install construction wood fence for proposed restaurant. No change in use, egress or occupancy.”
Building history
- Alteration, filed Oct 14, 2009, plan exam - approved, described as “Change offices on 1ST and mezzanine to photo studio.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $11,877,750
- 2026–27 Tax
- $1,236,151
- Market value (city estimate)
- $26,395,000
- Taxable value
- $11,383,650
- Assessed land
- $1,174,500
- Assessed improvements
- $10,703,250
Zoning
M1-9A/R12: floor area ratio 14.53 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Variance or Special Permit (Board of Standards and Appeals 151-10-BZ): Variance or Special Permit, Withdrawn, filed Aug 16, 2010, decided Dec 7, 2010. Special Permit (§73-36) to legalize the operation of a physical culture establishment (Bamboo Garden Spa). M1-6 zoning district.
- Garment Center Text Amendment (City Planning 2018M0412): Completed, decided Dec 26, 2018. The NYC Department of City Planning proposes a zoning text amendment to the Special Garment Center District to better reflect the current land use and promote a healthy mix of uses. In addition to changes regarding use regulations within…