# 253 West 35th Street, Manhattan

Commercial · built c. 1924 · Block 785, Lot 11.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1007850011/253-west-35-street

More construction in Garment District: https://umarelli.org/nyc/manhattan/garment-district.md

Every lot on block 785: https://umarelli.org/nyc/manhattan/785.md

## Building permits

- Alteration, filed Oct 26, 2026, estimated cost $120K, described as “Filed to establish offices on the 7th and 12th floors.”
- Alteration, filed Oct 30, 2024, estimated cost $1K, described as “Erect a non-illuminated accessory pole banner sign on existing brackets @west 35 street elevation view. No change in use, egress, or occupancy.”
- Alteration, filed Oct 30, 2024, estimated cost $1K, described as “Erect an illuminated accessory cabinet sign @west 35 street elevation view. No change in use, egress, or occupancy. (new york blood center)”
- Alteration, filed Jun 26, 2024, estimated cost $216K, described as “Architectural changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed Jun 25, 2024, estimated cost $3K, described as “Standpipe changes on the 1st floor as indicated on drawings.”
- Alteration, filed Jun 25, 2024, estimated cost $24K, described as “Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed Jun 25, 2024, estimated cost $48K, described as “Plumbing changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed Jun 25, 2024, estimated cost $85K, described as “Mechanical changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed May 29, 2024, estimated cost $3K, described as “Standpipe changes on the 1st floor as indicated on drawings.”
- Alteration, filed May 28, 2024, estimated cost $24K, described as “Sprinkler changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed May 28, 2024, estimated cost $48K, described as “Plumbing changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed May 28, 2024, estimated cost $85K, described as “Mechanical changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed May 27, 2024, estimated cost $216K, described as “Architectural changes on the 1st floor and mezzanine as indicated on drawings.”
- Alteration, filed Jan 22, 2024, estimated cost $100K, described as “New liner in existing brick chimney. No change in means of egress use group or occupancy.”
- Alteration, filed Apr 14, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2023, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2023, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 20, 2023, estimated cost $275K, described as “Local Law 11 Facade Repairs work that includes brick masonry repairs, replacement of brick masonry parapet wall, cut and point mortar joints, etc. as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 4, 2021, estimated cost $35K, described as “Installation of 2 units on the 10TH floor with a total capacity of 10 tons. No change to egress, use, or occupancy.”
- Alteration, filed Aug 16, 2021, estimated cost $245K, described as “Installation of 16 units on the west store & middle store 1ST floor, 9TH floor, and 15TH floor with a total capacity of 70 tons. No change to egress, use, or occupation.”
- Alteration, filed Aug 10, 2021, estimated cost $8K, described as “Propose sprinkler modifications at cellar, 001 and mezzanine floors all as per plans herewith filed. No change in use, egress, or occupancy filed under this application.”
- Alteration, filed Jun 22, 2021, estimated cost $98K, described as “Installation of air handlers and condenser units on the 3RD floor with a total capacity of 28 tons. No change to egress, use, or occupancy.”
- Alteration, filed Jun 18, 2021, estimated cost $5K, described as “Enlargement to an existing opening on the first floor of an existing commercial building, in conjunction with interior renovation. No change in use, occupancy or egress.”
- Alteration, filed Jun 3, 2021, estimated cost $5K, described as “Plumbing work in conjunction with interior renovation of an existing commercial space on the cellar, first, and mezzanine floors of an existing commercial building. No change in use, occupancy, or egress.”

3 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1007850011/253-west-35-street.

## Property taxes

- Assessment: $10,913,850
- 2026–27 Tax: $1,185,135
- Market value (city estimate): $24,253,000
- Taxable value: $10,913,850
- Assessed land: $1,075,500
- Assessed improvements: $9,838,350

## Zoning

M1-9A/R12: floor area ratio 14.54 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Garment Center Text Amendment (City Planning 2018M0412): Completed, decided Dec 26, 2018. The NYC Department of City Planning proposes a zoning text amendment to the Special Garment Center District to better reflect the current land use and promote a healthy mix of uses. In addition to changes regarding use regulations within…
- 253 W35TH ST (City Planning P1998M0033): Completed, decided Sep 26, 1997. CERTIFICATION TO ALLOW CONVERSION OF THE 5TH FLOOR FROM\*UG-16 TO UG-6B & PRESERVATION OF THE 4TH FLOOR AS UG-16