79 7th Avenue, Manhattan
Co-op · 64 units · built c. 1938 · Block 791, Lot 1.
Building permits
- Alteration, filed Sep 4, 2026, estimated cost $15K, described as “Installation of construction fence for public protection during construction work. No change in use, egress, or occupancy”
- Alteration, filed Aug 18, 2026, estimated cost $110K, described as “Interior renovation of (6th flr.) apt. #6B. Including replacement &/or refinishing of baths, minor non-loadbearing partitions relocation/replacement, doors & frames, replacement of millwork/cabinetry, & finishes. No change in use, egress,…”
- Alteration, filed Aug 10, 2026, described as “Installation of temporary plywood fence enclosure as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 3, 2026, estimated cost $308K, described as “Hereby filing for the interior renovation of existing apartment 3C located on the third floor. No change to use occupancy or egress.”
- Alteration, filed May 1, 2026, estimated cost $59K, described as “Hereby filing for the renovation to existing bathroom located in apartment 7H. No change to use occupancy or egress.”
- Alteration, filed Mar 26, 2026, estimated cost $100K, described as “Propose sidewalk and vault repair all as per plans herewith filed. No change in use, egress or occupancy filed under this application.”
- Alteration, filed Oct 20, 2025, estimated cost $132K, described as “Removal and reconstruction of interior non-bearing partitions, doors and flooring as shown on drawings filed herewith.”
- Alteration, filed Sep 5, 2025, estimated cost $265K, described as “Hereby filing for the interior renovation of existing apartment 7F and roof terrace. Located on the seventh floor., no change to use occupancy or egress. Plumbing filing under subsequent application”
- Alteration, filed Nov 11, 2024, estimated cost $143K, described as “Interior renovation in apt 2J filed in conjunction with DOB no pl and mh. No change to use, occupancy or egress,”
- Alteration, filed Oct 10, 2024, estimated cost $3K, described as “Installation of temporary shanty as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 7, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 24, 2024, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback”
- Alteration, filed Jul 17, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 26, 2024, estimated cost $369K, described as “Facade and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Jan 19, 2024, estimated cost $55K, described as “Apt. 7D renovation of kitchen and bathroom. Removal of non-bearing interior wall between existing kitchenette and living room. As per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 15, 2023, estimated cost $146K, described as “Hereby filing for the interior renovation of existing apartment 7H and roof terrace. Located on the seventh floor., no change to use occupancy or egress. Plumbing filing under subsequent application M00930782-S1.”
- Alteration, filed Jun 15, 2023, estimated cost $87K, described as “Filing to replace bulkhead roof skylight with roof as per drawings. No change in use, egress or occupancy is involved under this application.”
- Alteration, filed Mar 2, 2023, estimated cost $83K, described as “Interior renovation in apt 3J filed in conjunction with DOB no pl and mh. No change to use, occupancy or egress,”
- Alteration, filed Nov 5, 2020, estimated cost $18K, described as “Replace and relocate plumbing fixtures in apt# 3E/f as per plans submitted herewith.”
- Alteration, filed Aug 13, 2020, estimated cost $24K, described as “Replace all bathroom fixtures in existing locations. Install new shower in master bath. Relocate washer to kitchen. Replace kitchen sink and dishwasher. Install emergency shut off and drain pan under washer. Relocate stove from existing…”
- Alteration, filed Sep 19, 2019, estimated cost $35K, described as “Replacement of signage for retail in existing signage locations”
- Alteration, filed Jun 19, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold at off shed for facade repair work as per plan. No change in use egress or occupancy,sidewalk shed and pipe scaffold shall comply with chapter #33 of the NYC building…”
Property taxes
- Assessment
- $16,479,000
- 2026–27 tax
- $1,678,392
- Market value (city estimate)
- $36,620,000
- Taxable value
- $15,553,510
- Assessed land
- $3,249,000
- Assessed improvements
- $13,230,000
Tax breaks
- Co-op and condo abatement, with no end date, a $244,506 credit this tax year.
- Solar abatement, through Jun 30, 2028, a $12,544 credit this tax year.
Zoning
C6-3A (part of the lot is R8B): floor area ratio 6.97 built, 7.52 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 15, 2026: $1,556,000
- Mar 27, 2026: $1,725,000
- Jan 28, 2026: $1,565,000
- Dec 2, 2025: $1,600,000
- May 29, 2025: $1,530,000
- May 8, 2025: $2,400,000
- Mar 26, 2025: $2,220,000
- Sep 25, 2024: $3,125,000
- Aug 23, 2023: $2,075,000
- Apr 17, 2023: $740,000
The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- SABIAR REST (City Planning P1986M1332): Completed, decided Feb 10, 1988. CONSENT-UNENCLOSED SIDEWALK CAFE
- 87 7TH AVE (City Planning P1984M1363): Completed, decided Feb 28, 1985. RENEWAL-UNENCLOSED SIDEWALK CAFE