# 130 West 17th Street, Manhattan

Condominium · 14 units · built c. 1906 · Block 792, Lot 7503.

On Umarelli: https://umarelli.org/nyc/1007927503/130-west-17-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 792: https://umarelli.org/nyc/manhattan/792.md

## Building permits

- Alteration, filed Nov 10, 2026, estimated cost $1.6M, described as “Interior museum and office renovation on the cellar, 1ST and 2ND floors including lighting, mechanical, plumbing, sprinkler and electrical. No change in use, egress and/or occupancy.”
- Alteration, filed Mar 20, 2026, estimated cost $35K, described as “To file PL plumbing work in conjunction with DOB Now Build application job#M01333003. Install new plumbing fixtures at apartment 3N. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 20, 2026, estimated cost $15K, described as “To file interior demolition work at apartment 3N in conjunction with DOB Now Build application job#M01333003. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 4, 2026, estimated cost $35K, described as “To file MS work type in conjunction with DOB Now Build application job#M01333003. Install new rooftop HVAC for apartment 3N. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 4, 2026, estimated cost $111K, described as “Interior renovation of an existing building at apartment 3N. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 22, 2025, estimated cost $5K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 22, 2025, estimated cost $4K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 12, 2025, described as “Facade restoration project”
- Alteration, filed Apr 14, 2025, estimated cost $184K, described as “Fisp repairs includes selective brick, sill and lintel replacements required at the east andsouth elevations, and safety railing installation at the main roof. No change in use, egress or occupancy.”
- Alteration, filed Jul 23, 2024, described as “IRA to assist with Condition Assessment”
- Alteration, filed Sep 1, 2023, estimated cost $42K, described as “Mechanical modifications to include installation of refrigerant piping from each floor 2-8TH to the roof. Lines to be capped upon completion of piping. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2022, estimated cost $90K, described as “HVAC Upgrades”
- Alteration, filed Jul 7, 2021, estimated cost $7K, described as “Removal of existing and installation of new sprinkler heads.”
- Alteration, filed Jul 7, 2021, estimated cost $20K, described as “Installation of new plumbing fixtures and piping as per the submitted drawings. Installation of new water heater.”
- Alteration, filed Jul 7, 2021, estimated cost $10K, described as “Installation of kitchen exhaust, toilet exhaust, and dryer exhaust systems as per submitted drawings.”
- Alteration, filed Jul 6, 2021, estimated cost $178K, described as “Interior Alteration: Removal of Partitions, New partition layout with addition of a second bathroom”
- Alteration, filed Aug 2, 2019, described as “Installation of pipe scaffold and beta hoist as shown on drawings. No change in use egress or occupancy. We shall comply with chapter 33 of 2014 b.c”
- Alteration, filed Jul 24, 2019, described as “Installation of sidewalk shed as shown on drawings. No change in use egress or occupancy. We shall comply with chapter 33 of 2014 b.c”

## Building history

- Alteration, filed Apr 2, 2010, permit issued - entire job/work

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $6,566,052
- 2026–27 Tax: $540,469
- Market value (city estimate): $14,591,226
- Taxable value: $5,050,172
- Assessed land: $410,400
- Assessed improvements: $6,155,652
- Condo units with their own tax lots: 2

## Tax breaks

- Nonprofit exemption (museum), with no end date, about $68,383 a year below the full tax.

## Zoning

C6-2A: floor area ratio 7.88 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 27, 2026: $1,925,000
- Oct 2, 2025: $2,200,000
- Jul 17, 2025: $1,395,000
- Jun 15, 2022: $2,865,000
- Jun 2, 2022: $1,600,000
- Jan 15, 2021: $1,027,500
- Dec 18, 2019: $3,250,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 130 W17TH ST (City Planning P1982M0631): Completed, decided Jun 10, 1982. CERT(ZR15-21)FOR CONV OF A BLDG TO RESIDENTIAL USE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
