166 West 18th Street, Manhattan
Condominium · 38 units · built 2008 · Block 793, Lot 7508.
Building permits
- Alteration, filed Aug 16, 2026, estimated cost $364K, described as “Interior renovation of phb (penthouse) apt, removal of non-load bearing partitions, erection of new non-load bearing walls, finishes, millwork, painting, flooring and sanding work. All as per plans and applications. No change in use,…”
- Alteration, filed Sep 29, 2023, estimated cost $68K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 5, 2023, estimated cost $68K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, finishes and Mechanical modifications/additions on the 1st floor (M&T Bank) as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 21, 2023, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - the ups store. No change of use, egress or occupancy.”
- Alteration, filed Jul 29, 2022, estimated cost $3K, described as “Erect a business accessory face replacement on existing permitted sign cabinet #120632743. New face to read"m&t bank". No change in use, egress, or occupancy.”
- Alteration, filed May 23, 2022, estimated cost $59K, described as “Demo and construction of the existing retail space on the 1st FL (tenant B / Nail Salon). No change of use, egress or occupancy.”
- Alteration, filed May 13, 2022, estimated cost $72K, described as “Modification to the existing duct work and install a new split air-cooled air conditioning unit on the 1st FL Nail Salon (tenant B). No change of use, egress, or occupancy”
- Alteration, filed May 13, 2022, estimated cost $100K, described as “Modification to the existing duct work and install a new split air-cooled air conditioning unit, new diffusers and related piping as per plans on the 1st FL USPS retail space. No change of use, egress, or occupancy.”
- Alteration, filed May 13, 2022, estimated cost $12K, described as “Installation of plumbing fixtures for a Nail Salon on the 1st FL. No change of use, egress or occupancy.”
- Alteration, filed May 13, 2022, estimated cost $11K, described as “Modification to the existing sprinkler system for the tenant B (Nail Salon). No change of use, egress or occupancy.”
- Alteration, filed Apr 5, 2022, estimated cost $3K, described as “Modification of the plumbing fixtures and piping on the 1st FL USPS. No change of use, egress, or occupancy.”
- Alteration, filed Apr 5, 2022, estimated cost $8K, described as “Modification to the existing sprinkler heads on the 1st FL USPS. No change of use, egress or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $28K, described as “Existing commercial space, plumbing system in conjunction with job # M00686427, obtain plumbing permit for the install plumbing fixtures works.”
- Alteration, filed Mar 23, 2022, estimated cost $59K, described as “Existing commercial space, interior renovation modify partition for proposed at first floor space; install mechanical work for the ventilation system works; plumbing work at DOB now application; no change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2022, estimated cost $65K, described as “Demo and construction of the existing retail space on the 1st FL. No change of use, egress or occupancy.”
- Alteration, filed Jun 18, 2020, described as “Installation of sidewalk shed and supported scaffold as shown on drawings. No change in use egress or occupancy. We shall comply with chapter 33 of 2014 bc.”
- Alteration, filed Jan 15, 2020, estimated cost $5K, described as “Sprinkler work being filed for work in units 9BC on the 8th floor. No change to use, egress or occupancy.”
- Alteration, filed Jan 15, 2020, estimated cost $14K, described as “Mechanical work being filed for work in units 9BC on the 8th floor. No change to use, egress or occupancy.”
- Alteration, filed Aug 14, 2019, estimated cost $10K, described as “Pluming work in apartment 9B and 9C on the 9th floor. No change to use, egress or occupancy.”
- Alteration, filed Oct 23, 2017, estimated cost $18K, described as “Alteration type 3 - construction equipment - sidewalk- shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live LOAD300 per square feet.…”
Property taxes
- Assessment
- $14,002,646
- 2026–27 tax
- $1,623,403
- Market value (city estimate)
- $31,116,989
- Taxable value
- $13,451,188
- Assessed land
- $3,014,995
- Assessed improvements
- $10,987,651
- Condo units with their own tax lots
- 40
Zoning
C6-3A: floor area ratio 9.24 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 1, 2026: $1,550,000, Apt 7D
- Mar 31, 2026: $5,400,000, Unit PHB
- May 1, 2025: $1,500,000, Apt 4E
- Nov 21, 2024: $6,000,000, Apt PH11
- Aug 3, 2023: $1,580,000, Apt 7D
- Apr 18, 2023: $1,969,900, Apt 6C
- Oct 7, 2022: $1,350,000, Apt 7C
- Jul 28, 2022: $1,915,000, Apt 4C
- Jun 28, 2022: $1,330,000, Apt 5A
- May 11, 2022: $1,475,000, Apt 4D
The 10 most recent of 21 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- GALWAY HOOKER BAR - RENEWAL (City Planning P2017M0468): Completed, decided Apr 30, 2018. Renewal application by Carabean, LLC, d/b/a, Galway Hooker Bar for a revocable consent to operate an existing enclosed sidewalk cafe with 8 tables and 18 seats at 133 Seventh Avenue South on the northeast corner of West 10th Street).
- LE MADRI (City Planning P2001M0497): Completed, decided Jan 8, 2001. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 56 SEATS FOR 5-YEARS
- LE MADRI (City Planning P1999M0657): Completed, decided May 19, 1999. NEW-UNENCLOSED SIDEWALK CAFE WITH 56TH ST
- KANEDA (City Planning P1986M1278): Completed, decided Mar 12, 1987. RENEWAL-ENCLOSED SIDEWALK CAFE
- TASTE OF TOKYO (City Planning P1985M1314): Completed, decided Oct 24, 1985. RENEWAL-ENCLOSED SIDEWALK CAFE