# 133 West 21st Street, Manhattan

School · built c. 1911 · Block 797, Lot 18.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1007970018/133-west-21-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 797: https://umarelli.org/nyc/manhattan/797.md

## Building permits

- Alteration, filed Dec 19, 2025, estimated cost $50K, described as “Proposed to repair the facade and proposed inspection of the steel welding by a third party as per the plan. No change to Use, egress, or occupancy.”
- Alteration, filed Dec 8, 2025, described as “Initial CD5 fisp. Inspection, repairs per plans. No change in use, egress or occupancy. Adding new drops with new tie back locations option.”
- Alteration, filed Nov 7, 2025, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress, or occupancy. The sidewalk shed at west 21ST street elevation.”
- Alteration, filed Sep 19, 2025, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jun 25, 2025, estimated cost $10K, described as “Proposed to repair existing terra cotta on facade, all as per plan. No change of the use or occupancy or egress.”
- Alteration, filed Jun 13, 2025, estimated cost $250K, described as “Proposed to repair the ceiling on the 12th floor, all as per plan. No change of use, occupancy or egress.”
- Alteration, filed Jun 6, 2024, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 6, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 10, 2024, estimated cost $1.2M, described as “Interior renovation of 7TH floor commercial space as per plans filed herewith.”
- Alteration, filed Apr 23, 2024, estimated cost $50K, described as “Modifications to existing mechanical systems to include HVAC installation and installation of associated duct work. No change to use, occupancy or egress”
- Alteration, filed Sep 6, 2023, estimated cost $20K, described as “Re-filing of plumbing work under alt. 2 #102085994 as per plans filed herewith.”
- Alteration, filed Sep 6, 2023, estimated cost $17K, described as “Refiling of plumbing work under alt. 2 #104464027 as per plans filed herewith.”
- Alteration, filed Sep 6, 2023, estimated cost $15K, described as “Re-filing of alt. 2 sprinkler application #104782754 for modification to existing sprinkler system.”
- Alteration, filed Feb 27, 2023, estimated cost $50K, described as “Interior renovation of 12TH floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 9, 2022, estimated cost $103K, described as “Installation of structural steel dunnage framing on roof of existing commercial building as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2022, estimated cost $46K, described as “Sprinkler modifications for 6TH floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, estimated cost $95K, described as “Plumbing modifications for 6TH floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, estimated cost $509K, described as “HVAC modifications for 6TH floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 13, 2022, estimated cost $735K, described as “Interior renovation of 6TH floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 15, 2020, estimated cost $8K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 15, 2020, estimated cost $6K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 2, 2020, estimated cost $22K, described as “Sprinkler modifications to comply with local law 26/2004 for existing commercial building as per plans filed herewith. N o change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2019, estimated cost $25K, described as “Installation of new steel framing and new concrete slab construction to close existing sidewalk hatches as per plans filed herewith. No change in use, egress or occupancy.”

## Building history

- Alteration, filed Feb 20, 2018, permit issued - entire job/work
- Alteration, filed Jan 24, 2013, plan exam - approved, described as “Alteration type-1 to establish existing legal use as per drawings filed herewith.”
- Alteration, filed May 29, 1990, signed off Dec 21, 2010, described as “Convert commercial loft on 12TH floor to two(2) class "a" apartments. New bathrooms at 12TH floor.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $12,224,250
- 2026–27 Tax: $1,265,900
- Market value (city estimate): $27,165,000
- Taxable value: $11,657,610
- Assessed land: $1,845,000
- Assessed improvements: $10,379,250

## Zoning

C6-3A: floor area ratio 11.68 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology