# 125 West 21st Street, Manhattan

Condominium · 52 units · built 2006 · Block 797, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1007977501/125-west-21-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 797: https://umarelli.org/nyc/manhattan/797.md

## Building permits

- Alteration, filed Oct 13, 2026, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado”
- Alteration, filed May 7, 2026, estimated cost $9K, described as “Install gas piping for new bbq units as per plans. No change to use, occupancy or egress.”
- Alteration, filed Feb 28, 2023, estimated cost $650, described as “Install illuminated wall sign (hotworx)”
- Alteration, filed Feb 9, 2023, estimated cost $15K, described as “Modification of existing sprinkler system. There is no change in occupancy, use, or egress”
- Alteration, filed Feb 9, 2023, estimated cost $70K, described as “Modification to plumbing fixtures as per plans filed. There is no change in occupancy, use, or egress.”
- Alteration, filed Feb 9, 2023, estimated cost $100K, described as “New ac unit and ductwork. No change to use or egress. There is no change in occupancy, use, or egress.”
- Alteration, filed Feb 8, 2023, estimated cost $175K, described as “Application filed for interior partitions and related finishes, as per plans.no change in use, egress, occupancy or bulk.”
- Alteration, filed Aug 12, 2022, estimated cost $4K, described as “The demolition of a non structrual partition that combines the entrance of apartment 2D and 2E into a single entrance. The buildings public hallway is returned to its original size and configuration with apts 2D and 2E having their…”
- Alteration, filed Apr 13, 2018, estimated cost $5K, described as “Installation of a temporary scaffold @ 10TH floor balcony as per plans. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Mar 26, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Building history

- Alteration, filed Jul 10, 2002, signed off Aug 17, 2017, described as “Proposed six story vertical extension on existing four story building. Foundation and structural application to be filed under seperate application.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $15,742,353
- 2026–27 Tax: $1,736,312
- Market value (city estimate): $34,983,000
- Taxable value: $14,187,427
- Assessed land: $1,066,501
- Assessed improvements: $14,675,852
- Condo units with their own tax lots: 53

## Zoning

C6-3A: floor area ratio 6.93 built, 7.52 allowed by base zoning.

## Recent sales

- Nov 24, 2025: $2,149,000, Apt 12A
- Oct 1, 2025: $945,000, Apt 4C
- Jun 8, 2023: $982,999, Apt 6C
- Apr 4, 2023: $935,000, Apt 2C
- Mar 16, 2023: $1,825,000, Apt 2E
- Sep 26, 2022: $1,500,000, Apt 2D
- Sep 19, 2022: $999,000, Apt 7C
- Jul 26, 2022: $1,550,000, Apt 5D
- Mar 15, 2022: $2,825,000, Apt 10B
- Jan 28, 2022: $1,900,000, Apt 8E

The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 116-122 W21ST ST (City Planning P2003M0029): Completed, decided Dec 17, 2002. 00DCP054M: SPECIAL PERMIT PURSUANT TO SECTION S 13-562 AND 74-52 OF THE ZR, FOR A PUBLIC PARKING GARAGE TO BE LOCATED IN THE FIRST AND CELLAR LEVELS OF A PROPOSED NEW RESIDENTIAL BUILDING

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
