# 126 West 22nd Street, Manhattan

Condominium · 22 units · built c. 1911 · Block 797, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1007977502/126-west-22-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 797: https://umarelli.org/nyc/manhattan/797.md

## Building permits

- Alteration, filed Feb 4, 2026, estimated cost $350K, described as “Hereby filing for the interior renovation of existing apartment 5N located on the fifth floor. No change to use occupancy or egress.”
- Alteration, filed Jun 25, 2025, estimated cost $200K, described as “Sidewalk Vault Repair as per plans filed herewith. No Change to use, egress or occupancy”
- Alteration, filed Jun 10, 2025, estimated cost $190K, described as “Herewith filing for the removal and replacement of mechanical units, as per plans submitted. There is no change to use, egress or occupancy.”
- Alteration, filed Mar 27, 2025, estimated cost $7K, described as “Herewith filing the removal of slab on metal deck, as per plans submitted. There is no change to use, egress or occupancy under this application.”
- Alteration, filed Feb 24, 2025, estimated cost $47K, described as “Alteration of cellar and first floor mechanical rooms to become a single, double height mechanical room, to accommodate the replacement of 2 existing condensing units with a new heat pump. Mechanical and structural filed under separate…”
- Alteration, filed Jul 26, 2021, estimated cost $10K, described as “Installation of a temporarily material hoist per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jul 26, 2021, estimated cost $19K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 19, 2021, estimated cost $40K, described as “New heat pump system for heating/cooling (qty 2) with new ductwork and refrigerant piping, to replace existing AC unit with gas furnace heating”
- Alteration, filed Jan 21, 2020, estimated cost $28K, described as “New plumbing fixtures in conjunction with renovation of apartment #6N on the 6TH floor. Gase on common meter. No change in use, occupancy or egress.”
- Alteration, filed Jan 17, 2020, estimated cost $30K, described as “Mechanical work for renovation of apartment 6N. Including installation of AC system, steam radiators and air exhaust fans for Bathroom, Dryer and Kitchen.”
- Alteration, filed Aug 13, 2019, estimated cost $60K, described as “Installation of (1)new gas meter and room in cel. Work includes, but not limited to, new gas riser from cel-12 and gas piping modifications to existing gas distribution piping on 12TH fl and 12 fl mz to serve apt #12N. No change to use…”
- Alteration, filed Jun 19, 2019, estimated cost $5K, described as “Installation of Sidewalk Shed as per plans.”

## Property taxes

- Assessment: $8,947,929
- 2026–27 Tax: $881,617
- Market value (city estimate): $19,884,286
- Taxable value: $8,183,226
- Assessed land: $549,451
- Assessed improvements: $8,398,478
- Condo units with their own tax lots: 23

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $109,482 credit this tax year.

## Zoning

C6-3A: floor area ratio 9.74 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Feb 26, 2026: $3,650,000, Apt 11S
- Oct 8, 2025: $2,614,000, Apt 5N
- May 23, 2024: $2,900,000, Apt 10S
- May 5, 2022: $5,100,000, Unit PH-S
- Nov 22, 2019: $2,980,000, Apt 4N
- Oct 1, 2018: $2,750,000, Apt 3S
- Jul 24, 2018: $3,000,000, Apt 6N
- Jun 27, 2018: $3,360,000, Apt 11N
- May 31, 2018: $6,330,000, Unit PH-S
- Sep 15, 2017: $3,412,500, Apt 7S

The 10 most recent of 11 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
