# 120 West 23rd Street, Manhattan

Apartment Building · 42 units · built 1987 · Block 798, Lot 54.

On Umarelli: https://umarelli.org/nyc/1007980054/120-west-23-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 798: https://umarelli.org/nyc/manhattan/798.md

## Building permits

- Alteration, filed Nov 20, 2023, described as “Suspended scaffold outrigger system for exterior facade restoration work.”
- Alteration, filed Sep 18, 2023, estimated cost $550, described as “Illuminated non-advertising accessory wall sign - optum. No change of use, egress or occupancy.”
- Alteration, filed Aug 12, 2023, estimated cost $1K, described as “Temporary storage of equipment on top of heavy duty sidewalk shed. Sidewalk shed filed separately. Storage shall comply with chapter #33 of the 2022 code.no change in use, occupancy or egress.”
- Alteration, filed Jun 2, 2023, estimated cost $549K, described as “Exterior repairs to include masonry repair, shelf angle replacement, concrete patching, stucco patching, masonry coating and railing installation as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”

## Building history

- Major Renovation — Conversion, filed Sep 29, 2004, permit issued - entire job/work, 42 units added, 15 stories, described as “We are filing a no work application in c onjunction with a tax lot s ision to amend the metes and bounds and record deed restriction for tax lots und er one zoning lot.”
- Alteration, filed Jun 16, 1999, permit issued - entire job/work, units 40 to 42, described as “Herewith file change of use at cellar, 1ST &amp; 2ND. Floor. Amended c of o to be obtained.”
- Major Renovation — Conversion, filed Nov 1, 1995, permit issued - entire job/work, 42 units added, described as “Partition existing commercial spaces, provide additional dining room for eating &amp; drinking establishment.”
- Major Renovation — Conversion, filed May 12, 1992, permit issued - entire job/work, 42 units added, 15 stories, described as “Convert part of cellar to commercial use,eliminate community use on 1ST &amp; 2ND fl.convert community use on 2ND fl.to resid.use,remove stair from former community lobby to 2ND fl. Install bathrms.kitchens,toilets.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $9,887,850
- 2026–27 Tax: $1,151,914
- Market value (city estimate): $21,973,000
- Taxable value: $9,272,430
- Assessed land: $1,161,000
- Assessed improvements: $8,726,850

## Zoning

C6-3X: floor area ratio 6.55 built, 9.00 allowed by base zoning.

## Recent sales

- Apr 15, 2026: $34,200,000, 48,539 sq ft ($705 per sq ft)

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- THE MILAN (City Planning P2000M0293): Completed, decided Nov 26, 2012. AUTH TO ADD APPROX 28,000SF TO AN EXISTING 15-STORY MIX-USE\*BLDG BY ADDING A 25FT WIDE, 47-STORY HIGH PARTITION ON THE\*WEST SIDE OF THE BLDG

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
