112 West 25th Street, Manhattan
Hotel · built 2016 · Block 800, Lot 49.
Building permits
- Alteration, filed Sep 17, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Apr 22, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jul 29, 2025, estimated cost $135K, described as “Replace three (3) direct-vent gas-fired boilers as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 27, 2020, estimated cost $450, described as “Illuminated non advertising accessory wall sign - inside property lines - somewhere nowhere. No change to use, egress or occupancy.”
- Alteration, filed Nov 12, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- Alteration, filed Jun 6, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2019, estimated cost $750, described as “Illuminated non advertising accessory hanging sign - inside property lines - renaissance hotel. No change to use, egress or occupancy.”
- Alteration, filed Jan 22, 2019, estimated cost $7K, described as “Installation of pipe scaffold and needle beam as per plans. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Apr 9, 2018, estimated cost $30K, described as “Installation of heavy duty sidewalk shed during new building construction, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 2, 2018, estimated cost $90K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $34,042,500
- 2026–27 tax
- $3,310,652
- Market value (city estimate)
- $75,650,000
- Taxable value
- $30,518,550
- Assessed land
- $733,950
- Assessed improvements
- $33,308,550
Zoning
M1-8A/R11: floor area ratio 21.79 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning map change, Zoning text change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…