# 112 West 25th Street, Manhattan

Hotel · built 2016 · Block 800, Lot 49.

On Umarelli: https://umarelli.org/nyc/1008000049/112-west-25-street

More construction in Chelsea: https://umarelli.org/nyc/manhattan/chelsea.md

Every lot on block 800: https://umarelli.org/nyc/manhattan/800.md

## Building permits

- Alteration, filed Sep 17, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Apr 22, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jul 29, 2025, estimated cost $135K, described as “Replace three (3) direct-vent gas-fired boilers as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 27, 2020, estimated cost $450, described as “Illuminated non advertising accessory wall sign - inside property lines - somewhere nowhere. No change to use, egress or occupancy.”
- Alteration, filed Nov 12, 2019, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- No Work, filed Nov 5, 2019
- Alteration, filed Jun 6, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2019, estimated cost $750, described as “Illuminated non advertising accessory hanging sign - inside property lines - renaissance hotel. No change to use, egress or occupancy.”
- Alteration, filed Jan 22, 2019, estimated cost $7K, described as “Installation of pipe scaffold and needle beam as per plans. All equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application.”
- Alteration, filed Apr 9, 2018, estimated cost $30K, described as “Installation of heavy duty sidewalk shed during new building construction, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 2, 2018, estimated cost $90K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”

## Property taxes

- Assessment: $34,042,500
- 2026–27 Tax: $3,310,652
- Market value (city estimate): $75,650,000
- Taxable value: $30,518,550
- Assessed land: $733,950
- Assessed improvements: $33,308,550

## Zoning

M1-8A/R11: floor area ratio 21.79 built, above the 12.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology