- Alteration, filed Jun 1, 2026, estimated cost $30K, described as “Replacement of air conditioning units on the 5th and 6th floors. No change in use egress and occupancy.”
- Alteration, filed Dec 2, 2025, estimated cost $1.0M, described as “Interior lobby renovation to include an existing commerical space and adjacent lobby and convert bothinto one large r-1 lobby at the ground floor. Install a dumbwaiter from the ground floor to second floor”
- Alteration, filed Oct 24, 2025, estimated cost $850K, described as “Renovation of existing bathrooms on floors 3 through 9 - north side of building.”
- Alteration, filed Oct 24, 2025, estimated cost $2.5M, described as “Interior renovation of existing bathrooms and sleeping areas on floor 3 through 9. No change in use , occupancy or egress proposed.”
- Alteration, filed Oct 1, 2025, estimated cost $481K, described as “Herewith filing interior renovation of 2nd floor existing dining area and new partitions for office spaces on 8th floor as per plans. No change in use, occupancy or egress proposed.”
- Alteration, filed Aug 14, 2025, estimated cost $10K, described as “Direct replacement of air conditioning unit in the lobby area. No change in use egress and occupancy.”
- Alteration, filed Dec 10, 2024, estimated cost $125K, described as “Remove existing sidewalk vault roof slab and replace with new concrete slab.”
- Alteration, filed Jan 29, 2024, estimated cost $20K, described as “Temporary shoring of sidewalk vault. No change in use, egress, or occupancy.”
- Alteration, filed Aug 3, 2021, estimated cost $1K, described as “Installation of temporary storage as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jul 15, 2021, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Feb 24, 2021, estimated cost $246K, described as “Facade repairs: brick masonry replacement, brick pointing,lintel replacement,door threshold replacement, stone rebuilding,coping stone replacement, glass replacement and roof parapet railing modification as per plan. No change in use,…”
- Alteration, filed Jan 8, 2020, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $7,231,995
- 2026–27 Tax
- $729,036
- Market value (city estimate)
- $16,071,100
- Taxable value
- $6,713,658
- Assessed land
- $688,500
- Assessed improvements
- $6,543,495
- Condo units with their own tax lots
- 5
Zoning
M1-8A/R11: floor area ratio 9.30 built, 12.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Appeal (Board of Standards and Appeals 189-10-A): Appeal, Denied, filed Oct 8, 2010, decided Apr 5, 2011. Appeal challenges the Department of Buildings interpretation that the proposed use is a transient hotel .M1-6 zoning district.