151 West 26th Street, Manhattan
Commercial · built c. 1911 · Block 802, Lot 8.
Building permits
- Alteration, filed Feb 20, 2026, estimated cost $430K, described as “Build out of office space at the 6th floor. No change to use, egress or occupancy.”
- Alteration, filed Feb 19, 2026, estimated cost $88K, described as “Plumbing and Sprinkler work being filed on the 6th floor. No change to use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $438K, described as “Interior renovation of 3RD floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 1, 2024, estimated cost $106K, described as “Interior renovation of existing 1st floor commercial space: replace millwork & finishes and replace light fixtures. No change to use, egress, or occupancy.”
- Alteration, filed Jun 18, 2024, estimated cost $561K, described as “Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11TH fl as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 31, 2024, estimated cost $100K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 11TH fl as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 30, 2023, estimated cost $75K, described as “Interior partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 7, 2022, estimated cost $113K, described as “Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 2ND and 6TH floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 16, 2022, estimated cost $10K, described as “Installation of roof deck with pavers on pedestal as shown on drawings.”
- Alteration, filed Oct 25, 2021, estimated cost $40K, described as “Interior application filed for interior renovation to 9TH floor as shown on the plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 5, 2021, estimated cost $85K, described as “Facade repair including miscellaneous brick repair, decorative stone repair, decorative sill replacement and masonry repairs as per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Aug 23, 2021, estimated cost $95K, described as “Installation of (2) new air cooled ac unit and tie in with existing ductwork systems. Provide automatic controls to operate in an energy effcient manner. No change in use, egress, or occupancy.”
- Alteration, filed Jul 21, 2021, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed Mar 26, 2020, estimated cost $50K, described as “Installation of Mechanical Units. No Change in Occupancy Use or Egress.”
- Alteration, filed Dec 17, 2019, estimated cost $50K, described as “Sprinkler work at 7TH floor (pcc) as indicated on drawings.”
- Alteration, filed Dec 17, 2019, estimated cost $100K, described as “Mechanical work at 7TH floor (pcc) as indicated on drawings.”
- Alteration, filed Dec 17, 2019, estimated cost $10K, described as “Plumbing work at 7TH floor (pcc) as indicated on drawings.”
- Alteration, filed Jul 29, 2019, estimated cost $33K, described as “Installation of New Plumbing Fixtures & Replacement of Plumbing Fixtures. No Change in Occupancy, Use or Egress.”
- Alteration, filed Jul 24, 2019, estimated cost $11K, described as “Modification to Existing Sprinkler System. No Change in Occupancy, Use or Egress.”
- Alteration, filed Jul 23, 2019, estimated cost $42K, described as “Install Three (3) New Lavatories, One (1) New Toilet & One (1) New Urinal, and Relocate Six (6) Lavatories, Two (2) Urinals, Seven (7) WC's & Two (2) HW Heaters (Non-gas) on the 7 Floor. No Change in Occupancy, Use or Egress.”
- Alteration, filed Jul 23, 2019, estimated cost $20K, described as “Modification to Existing Toilet Exhaust. No Change in Occupancy, Use or Egress.”
- Alteration, filed Jul 22, 2019, estimated cost $250K, described as “Replacement of Mechanical Units & Ductwork Modification. No Change in Occupancy, Use or Egress.”
- Alteration, filed Jan 4, 2019, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $15,732,900
- 2026–27 tax
- $1,706,705
- Market value (city estimate)
- $34,962,000
- Taxable value
- $15,732,900
- Assessed land
- $2,767,500
- Assessed improvements
- $12,965,400
Zoning
M1-8A/R11: floor area ratio 11.78 built, 12.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning map change, Zoning text change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…