151 West 28th Street, Manhattan
Co-op · 16 units · built c. 1922 · Block 804, Lot 8.
Building permits
- Alteration, filed Oct 3, 2022, estimated cost $11K, described as “Install (4) new heat pump split-ductless HVAC system at APT#8W of existing 9 story building. No change in use, egress or occupancy. No change in bulk.”
- Alteration, filed Feb 3, 2022, estimated cost $114K, described as “Filing for 1st Floor Slab Repairs; no change to use, egress or occupancy.”
- Alteration, filed Feb 18, 2020, estimated cost $19K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 14, 2020, estimated cost $4K, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Building history
- Alteration, filed Aug 5, 2013, permit issued - entire job/work, units 15 to 16, described as “Conversion from manufacturing to residential on floor 3 and a new certificate of occupancy to be obtained. All work filed under separate application. This application is filed to supersede application number 103993270. The existing BSA…”
- Alteration, filed Aug 6, 2012, signed off May 2, 2017, units 12 to 13
- Alteration, filed Nov 30, 2011, signed off Feb 13, 2018, units 13 to 15, described as “Change the use on the 5,and 7 floor from factory to class a apartments. General construction, plumbing changes. BSA approval has been obtained under calendar number 19-05-bz.”
- Alteration, filed Dec 14, 2004, plan exam - disapproved, described as “Conversion from manufacturing to residential on floors 2, 3, 5 and 7. A new Certificate of Occupancy to be obtained. All work filed under separate application.”
- Alteration, filed Sep 26, 1995, plan exam - disapproved, described as “Application is filed to convert factory to residentail use as indicated on drawings.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $5,602,050
- 2026–27 Tax
- $510,013
- Market value (city estimate)
- $12,449,000
- Taxable value
- $4,902,780
- Assessed land
- $252,900
- Assessed improvements
- $5,349,150
Tax breaks
- Co-op and Condo Abatement, with no end date, a $100,025 credit this tax year.
Zoning
M1-8A/R11: floor area ratio 8.05 built, 12.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 30, 2023: $1,995,000
- Oct 28, 2021: $2,400,000
- Jul 29, 2021: $2,180,000
- Apr 6, 2021: $1,995,000
- Sep 25, 2020: $1,950,000, Apt 4W
- Aug 12, 2019: $1,775,000
- Aug 24, 2018: $1,975,000
- Jul 9, 2018: $1,585,000
- Apr 3, 2018: $2,550,000
- Feb 15, 2018: $2,057,500
The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Change to an Earlier Grant (Board of Standards and Appeals 19-05-BZIII): Change to an Earlier Grant, Granted, filed Aug 26, 2013, decided Nov 19, 2013. Extension of Time to complete construction of a previously granted Variance (§72-21) for the change in use of portions of an existing nine-story, mixed-use building to residential use, which expires November 10, 2013. M1-6 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 19-05-BZII): Change to an Earlier Grant, Granted, filed Sep 18, 2009, decided Nov 10, 2009. Extension of Time to complete construction of a previously granted Variance (§72-21) for the change in use of portions of an existing nine-story, mixed-use building to residential use which expires on October 18, 2009. M1-6 zoning district.
- Variance or Special Permit (Board of Standards and Appeals 19-05-BZ): Variance or Special Permit, Granted, filed Jan 31, 2005, decided Oct 18, 2005. Variance (§72-21) to permit the proposed change of use of portions of a nine-story, mixed-use building to Use Group 2 residential use (16 residential units). No parking is proposed. The proposal is contrary to Z.R. §42-00.