# 151 West 28th Street, Manhattan

Co-op · 16 units · built c. 1922 · Block 804, Lot 8.

On Umarelli: https://umarelli.org/nyc/1008040008/151-west-28-street

More construction in Garment District: https://umarelli.org/nyc/manhattan/garment-district.md

Every lot on block 804: https://umarelli.org/nyc/manhattan/804.md

## Building permits

- Alteration, filed Oct 3, 2022, estimated cost $11K, described as “Install (4) new heat pump split-ductless HVAC system at APT#8W of existing 9 story building. No change in use, egress or occupancy. No change in bulk.”
- Alteration, filed Feb 3, 2022, estimated cost $114K, described as “Filing for 1st Floor Slab Repairs; no change to use, egress or occupancy.”
- Alteration, filed Feb 18, 2020, estimated cost $19K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 14, 2020, estimated cost $4K, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Building history

- Alteration, filed Aug 5, 2013, permit issued - entire job/work, units 15 to 16, described as “Conversion from manufacturing to residential on floor 3 and a new certificate of occupancy to be obtained. All work filed under separate application. This application is filed to supersede application number 103993270. The existing BSA…”
- Alteration, filed Aug 6, 2012, signed off May 2, 2017, units 12 to 13
- Alteration, filed Nov 30, 2011, signed off Feb 13, 2018, units 13 to 15, described as “Change the use on the 5,and 7 floor from factory to class a apartments. General construction, plumbing changes. BSA approval has been obtained under calendar number 19-05-bz.”
- Alteration, filed Dec 14, 2004, plan exam - disapproved, described as “Conversion from manufacturing to residential on floors 2, 3, 5 and 7. A new Certificate of Occupancy to be obtained. All work filed under separate application.”
- Alteration, filed Sep 26, 1995, plan exam - disapproved, described as “Application is filed to convert factory to residentail use as indicated on drawings.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $5,602,050
- 2026–27 Tax: $510,013
- Market value (city estimate): $12,449,000
- Taxable value: $4,902,780
- Assessed land: $252,900
- Assessed improvements: $5,349,150

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $100,025 credit this tax year.

## Zoning

M1-8A/R11: floor area ratio 8.05 built, 12.00 allowed by base zoning.

## Recent sales

- May 30, 2023: $1,995,000
- Oct 28, 2021: $2,400,000
- Jul 29, 2021: $2,180,000
- Apr 6, 2021: $1,995,000
- Sep 25, 2020: $1,950,000, Apt 4W
- Aug 12, 2019: $1,775,000
- Aug 24, 2018: $1,975,000
- Jul 9, 2018: $1,585,000
- Apr 3, 2018: $2,550,000
- Feb 15, 2018: $2,057,500

The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Midtown South Mixed-Use Plan (MSMX) (City Planning 2024M0142): Zoning Map Change, Zoning Text Change, Completed, filed Jan 16, 2025, decided Aug 14, 2025. The Department of City Planning is seeking a Zoning Map amendment from M1-6 and M1-6D to M1-9A/R12, M1-8A/R12, and M1-8A/R11 and a Zoning Text amendment to facilitate the development of housing and support critical economic activity across…
- Change to an Earlier Grant (Board of Standards and Appeals 19-05-BZIII): Change to an Earlier Grant, Granted, filed Aug 26, 2013, decided Nov 19, 2013. Extension of Time to complete construction of a previously granted Variance (§72-21) for the change in use of portions of an existing nine-story, mixed-use building to residential use, which expires November 10, 2013. M1-6 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 19-05-BZII): Change to an Earlier Grant, Granted, filed Sep 18, 2009, decided Nov 10, 2009. Extension of Time to complete construction of a previously granted Variance (§72-21) for the change in use of portions of an existing nine-story, mixed-use building to residential use which expires on October 18, 2009. M1-6 zoning district.
- Variance or Special Permit (Board of Standards and Appeals 19-05-BZ): Variance or Special Permit, Granted, filed Jan 31, 2005, decided Oct 18, 2005. Variance (§72-21) to permit the proposed change of use of portions of a nine-story, mixed-use building to Use Group 2 residential use (16 residential units). No parking is proposed. The proposal is contrary to Z.R. §42-00.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
